2011-2013 Land Cruiser · Service Manual Drivetrain

P0705 Transmission Range Sensor Circuit Malfunction (PRNDL Input)

Diagnostic trouble codes · Vehicles built Sep 2011 – Dec 2011

DESCRIPTION

The Park/Neutral Position (PNP) switch detects the shift lever position and sends signals to the ECM.
DTC Code
DTC Detection Condition
Trouble Area
P0705
When one of the following conditions is met:
(A) Any 2 or more of the following signals are ON simultaneously (2 trip detection logic).
  1. The P input signal is ON.
  2. The N input signal is ON.
  3. The R input signal is ON.
  4. The D input signal is ON.
(B) Any 2 or more of the following signals are ON simultaneously (2 trip detection logic).
  1. The NSW input signal is ON.
  2. The R input signal is ON.
  3. The D input signal is ON.
(C) When any of the following conditions is met for 2.0 sec. or more when the shift lever is in S (2 trip detection logic).
  1. The NSW input signal is ON.
  2. The P input signal is ON.
  3. The N input signal is ON.
  4. The R input signal is ON.
(D) All the switches are off simultaneously for the P, R, N and D positions (2 trip detection logic).
  1. Park/neutral position switch
  2. Transmission control switch (Lower shift lever assembly)
  3. Open or short in park/neutral position switch circuit
  4. ECM

MONITOR DESCRIPTION

This DTC indicates a problem with the park/neutral position switch and the wire harness in the park/neutral position switch circuit.
The park/neutral position switch detects the shift lever position and sends a signal to the ECM.
For security, the park/neutral position switch detects the shift lever position so that the engine can be started only when the shift lever is in P or N.
The park/neutral position switch sends a signal to the ECM according to the shift lever position (P, R, N, D or S).
The ECM determines that there is a problem with the switch or related parts if it receives more than 1 position signal simultaneously. The ECM will illuminate the MIL and store the DTC.

WIRING DIAGRAM

C177781E03
C177781E04

INSPECTION PROCEDURE


DATA LIST

HINT:
Using the intelligent tester to read the Data List allows the values or states of switches, sensors, actuators and other items to be read without removing any parts. This non-intrusive inspection can be very useful because intermittent conditions or signals may be discovered before parts or wiring is disturbed. Reading the Data List information early in troubleshooting is one way to save diagnostic time.

NOTICE:
In the table below, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not.

  1. Warm up the engine.

  2. Turn the engine switch off.

  3. Connect the intelligent tester to the DLC3.

  4. Turn the engine switch on (IG).

  5. Turn the intelligent tester on.

  6. Enter the following menus: Powertrain / ECT / Data List.

  7. According to the display on the tester, read the Data List.

    ECT 
    Tester Display
    Measurement Item/Range
    Normal Condition
    Diagnostic Note
    Neutral Position SW Signal
    PNP switch status/
    ON or OFF
    Shift lever:
    1. In P or N: ON
    2. Not in P or N: OFF
    When the shift lever position displayed on the intelligent tester differs from the actual position, the adjustment of the PNP switch or shift cable may be incorrect.
    Shift SW Status (R Range)
    PNP switch status/
    ON or OFF
    Shift lever:
    1. In R: ON
    2. Not in R: OFF
    When the shift lever position displayed on the intelligent tester differs from the actual position, the adjustment of the PNP switch or shift cable may be incorrect.
    Shift SW Status (P Range)
    PNP switch status/
    ON or OFF
    Shift lever:
    1. In P: ON
    2. Not in P: OFF
    When the shift lever position displayed on the intelligent tester differs from the actual position, the adjustment of the PNP switch or shift cable may be incorrect.
    Shift SW Status (N Range)
    PNP switch status/
    ON or OFF
    Shift lever:
    1. In N: ON
    2. Not in N: OFF
    When the shift lever position displayed on the intelligent tester differs from the actual position, the adjustment of the PNP switch or shift cable may be incorrect.
    Shift SW Status (D Range)
    PNP switch status/
    ON or OFF
    Shift lever:
    1. In D: ON
    2. Not in D: OFF
    When the shift lever position displayed on the intelligent tester differs from the actual position, the adjustment of the PNP switch or shift cable may be incorrect.
    Sports Shift Up SW
    Sport shift up switch status/
    ON or OFF
    1. ON: Shift lever held in "+" (up-shift)
    2. OFF: Shift lever not in "+" (up-shift)
    -
    Sports Shift Down SW
    Sport shift down switch status/
    ON or OFF
    1. ON: Shift lever held in "-" (down-shift)
    2. OFF: Shift lever not in "-" (down-shift)
    -
    Sports Mode Selection SW
    Sport mode select switch status/
    ON or OFF
    Shift lever:
    1. ON: In S, "+" or "-"
    2. OFF: Not in S, "+" or "-"
    -


1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

  1. C146745E27
    Disconnect the C24 park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1. 2 (RB) - 6 (PL)
    2. 4 (B) - 5 (L)
    Shift lever in P
    Below 1 Ω
    2 (RB) - 1 (RL)
    Shift lever in R
    Below 1 Ω
    1. 2 (RB) - 9 (NL)
    2. 4 (B) - 5 (L)
    Shift lever in N
    Below 1 Ω
    2 (RB) - 7 (DL)
    1. Shift lever in D
    2. Shift lever in S, "+" or "-"
    Below 1 Ω
    1. 2 (RB) - 6 (PL)
    2. 4 (B) - 5 (L)
    Shift lever not in P
    10 kΩ or higher
    2 (RB) - 1 (RL)
    Shift lever not in R
    10 kΩ or higher
    1. 2 (RB) - 9 (NL)
    2. 4 (B) - 5 (L)
    Shift lever not in N
    10 kΩ or higher
    2 (RB) - 7 (DL)
    1. Shift lever not in D
    2. Shift lever not in S, "+" or "-"
    10 kΩ or higher



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
OK


2. INSPECT TRANSMISSION CONTROL SWITCH

  1. C146679E04
    Disconnect the E52 transmission control switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 (IG) - 7 (S)
    Shift lever in S, "+" or "-"
    Below 1 Ω
    3 (IG) - 7 (S)
    Shift lever not in S, "+" or "-"
    10 kΩ or higher



NG
REPLACE TRANSMISSION CONTROL SWITCH (LOWER SHIFT LEVER ASSEMBLY) (Click here)
OK


3. CHECK PARK/NEUTRAL POSITION SWITCH ASSEMBLY (POWER SOURCE)

  1. C146740E13
    Disconnect the C24 park/neutral position switch connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    C24-2 (RB) - Body ground
    Engine switch on (IG)
    11 to 14 V
    C24-2 (RB) - Body ground
    Engine switch off
    Below 1 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ENGINE SWITCH)
OK


4. CHECK TRANSMISSION CONTROL SWITCH (POWER SOURCE)

  1. C146729E11
    Disconnect the E52 transmission control switch connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    E52-3 (IG) - Body ground
    Engine switch on (IG)
    11 to 14 V
    E52-3 (IG) - Body ground
    Engine switch off
    Below 1 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (TRANSMISSION CONTROL SWITCH - ENGINE SWITCH)
OK


5. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM)

  1. C177486E01
    Disconnect the C45 ECM connector (for LHD).

  1. Disconnect the C46 ECM connector (for RHD).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    1. C45-2 (P) - Body ground
    2. C45-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in P
    11 to 14 V
    C45-26 (R) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in R
    11 to 14 V*
    1. C45-25 (N) - Body ground
    2. C45-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in N
    11 to 14 V
    C45-27 (D) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in D
    11 to 14 V
    1. C45-2 (P) - Body ground
    2. C45-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in P
    Below 1 V
    C45-26 (R) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in R
    Below 1 V
    1. C45-25 (N) - Body ground
    2. C45-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in N
    Below 1 V
    C45-27 (D) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in D
    Below 1 V
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    1. C46-2 (P) - Body ground
    2. C46-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in P
    11 to 14 V
    C46-26 (R) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in R
    11 to 14 V*
    1. C46-25 (N) - Body ground
    2. C46-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in N
    11 to 14 V
    C46-27 (D) - Body ground
    1. Engine switch on (IG)
    2. Shift lever in D
    11 to 14 V
    1. C46-2 (P) - Body ground
    2. C46-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in P
    Below 1 V
    C46-26 (R) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in R
    Below 1 V
    1. C46-25 (N) - Body ground
    2. C46-120 (NSW) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in N
    Below 1 V
    C46-27 (D) - Body ground
    1. Engine switch on (IG)
    2. Shift lever not in D
    Below 1 V

    HINT:
    *: The voltage will drop slightly due to turning on the back up light.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


6. CHECK HARNESS AND CONNECTOR (TRANSMISSION CONTROL SWITCH - ECM)

  1. C177782E01
    Disconnect the A38 ECM connector (for LHD).

  1. Disconnect the A52 ECM connector (for RHD).

  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A38-25 (S) - Body ground
    Shift lever in S, "+" or "-"
    11 to 14 V
    A38-25 (S) - Body ground
    Shift lever not in S, "+" or "-"
    Below 1 V
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    A52-25 (S) - Body ground
    Shift lever in S, "+" or "-"
    11 to 14 V
    A52-25 (S) - Body ground
    Shift lever not in S, "+" or "-"
    Below 1 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM (Click here)


← P0500 Vehicle Speed Sensor "A" (Sep 2011 – Dec 2011)P0710 Transmission Fluid Temperature Sensor "A" Circuit (+ P0712, P0713) (Sep 2011 – Dec 2011) →