2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REASSEMBLY

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL OIL PUMP RELIEF VALVE
  1. Coat the relief valve with engine oil and insert the relief valve and spring into the valve hole.

  1. Install the relief valve plug.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }


2. INSTALL OIL PUMP COVER
  1. Apply fresh engine oil to the drive and driven rotors.

  1. A223654E02
    Place the drive and driven rotors into the timing chain cover with the marks facing the oil pump cover side.
    Text in Illustration 
    *1
    Mark

  1. A225445
    Install the oil pump cover with the 8 bolts and screw.

    Torque:
    for screw:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    for bolt:
    9.1 N*m{ 93 kgf*cm , 81 in.*lbf }

    Text in Illustration 
    V100135
    Bolt
    V100136
    Screw

← REASSEMBLY (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →