2011-2013 Land Cruiser · Service Manual Drivetrain

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY

NOTICE:
Refer to the components illustration for the installation direction of the propeller shaft.

  1. for 1VD-FTV:

    1. C177453E01
      Align the matchmarks on the propeller shaft flange and differential.

    2. Connect the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      88 N*m{ 900 kgf*cm , 65 ft.*lbf }

    3. C177452E01
      Align the matchmarks on the yoke and transfer flange.

    4. Install the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      88 N*m{ 900 kgf*cm , 65 ft.*lbf }

  1. for 1GR-FE, 2UZ-FE and Center Grease Fitting type:

    1. C172296E01
      Align the matchmarks on the propeller shaft flange and differential.

    2. Connect the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      88 N*m{ 900 kgf*cm , 65 ft.*lbf }

    3. C172295E01
      Align the matchmarks on the propeller shaft flange and transfer flange.

    4. Install the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      88 N*m{ 900 kgf*cm , 65 ft.*lbf }


2. INSTALL PROPELLER SHAFT HEAT INSULATOR

  1. C172294
    Install the insulator with the 2 bolts.

    Torque:
    16 N*m{ 160 kgf*cm , 12 ft.*lbf }


3. INSTALL NO. 2 ENGINE UNDER COVER

  1. A178462
    Install the No. 2 engine under cover with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


4. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  1. A178461
    Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


5. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Push in the clip indicated by the arrow in the illustration to install the fender splash shield.

  1. Install the 3 bolts and screw.


6. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.

← REASSEMBLY (from Sep 2011)INSTALLATION (from Jan 2012) →