INSTALLATION
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
INSTALL FRONT PROPELLER SHAFT ASSEMBLY |
 |
- NOTICE:
- Refer to the components illustration for the installation direction of the propeller shaft.
for 1VD-FTV:
- Align the matchmarks on the propeller shaft flange and differential.
Connect the propeller shaft with the 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
- Align the matchmarks on the yoke and transfer flange.
Install the propeller shaft with the 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
for 1GR-FE, 2UZ-FE and Center Grease Fitting type:
- Align the matchmarks on the propeller shaft flange and differential.
Connect the propeller shaft with the 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
- Align the matchmarks on the propeller shaft flange and transfer flange.
Install the propeller shaft with the 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
| 2.
INSTALL PROPELLER SHAFT HEAT INSULATOR |
 |
- Install the insulator with the 2 bolts.
-
Torque:
- 16 N*m{
160 kgf*cm
, 12 ft.*lbf
}
| 3.
INSTALL NO. 2 ENGINE UNDER COVER
|
 |
- Install the No. 2 engine under cover with the 2 bolts.
-
Torque:
- 29 N*m{
296 kgf*cm
, 21 ft.*lbf
}
| 4.
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
|
 |
- Install the No. 1 engine under cover with the 10 bolts.
-
Torque:
- 29 N*m{
296 kgf*cm
, 21 ft.*lbf
}
| 5.
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
|
 |
Push in the clip indicated by the arrow in the illustration to install the fender splash shield.
Install the 3 bolts and screw.
| 6.
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
|
 |
- HINT:
- Use the same procedures described for the LH side.