2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSPECTION

Inspection · Vehicles built Sep 2011 – Dec 2011


INSPECT AIR SWITCHING VALVE ASSEMBLY

  1. A182396E02
    Measure the resistance of the valve.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1- 2
      20°C (68°F)
      4.5 to 5.5 Ω
      1 - Body ground
      Always
      1 MΩ or higher
      2 - Body ground
      Always
      1 MΩ or higher

      If the result is not as specified, replace the air switching valve assembly.

  1. Check the valve operation.

    1. A113141E01
      Blow air into port A and check that air is not discharged from port B.

    2. A113142E01
      Apply battery voltage across the terminals.

    3. Blow air into port A and check that air is discharged from port B.
      If the result is not as specified, replace the air switching valve assembly.


INSPECT NO. 1 AIR SWITCHING VALVE ASSEMBLY

  1. A182347E01
    Blow air into port B and check that air is not discharged from port C.

  1. A182348E01
    Apply vacuum of 33 kPa (250 mmHg, 9.83 in.Hg) to port A, blow air into port B and check that air is discharged from port C.
    If the result is not as specified, replace the No. 1 air switching valve assembly.


INSPECT NO. 2 AIR SWITCHING VALVE ASSEMBLY

  1. A113143E01
    Blow air into port B and check that air is not discharged from port C.

  1. A113144E01
    Apply vacuum of 33 kPa (250 mmHg, 9.83 in.Hg) to port A, blow air into port B and check that air is discharged from port C.
    If the result is not as specified, replace the No. 2 air switching valve assembly.

← REMOVAL (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →