2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

HINT:
  1. Use the same procedures for LHD and RHD vehicles.
  2. The procedures listed below are for LHD vehicles.


1. PRECAUTION

NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).


2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


3. REMOVE LOWER NO. 3 STEERING WHEEL COVER

  1. B181563
    Detach the 2 claws and remove the steering wheel cover.


4. REMOVE LOWER NO. 2 STEERING WHEEL COVER

  1. B189186E01
    Detach the 2 claws and remove the steering wheel cover.


5. REMOVE STEERING PAD

  1. B187261E01
    Using a T30 "TORX" socket wrench, loosen the 2 screws until the groove along the screw circumference catches on the screw case.

  1. B181568
    Pull out the steering pad from the steering wheel, as shown in the illustration. Then support the steering pad with one hand.

    NOTICE:
    When removing the steering pad, do not pull the airbag wire harness.

  1. Disconnect the horn connector.

  1. Disconnect the 2 connectors and remove the steering pad.

    NOTICE:
    When handling the airbag connector, take care not to damage the airbag wire harness.


6. REMOVE CRUISE CONTROL MAIN SWITCH

  1. B179759
    Disconnect the connector and clamp.

  1. B179760
    Remove the 2 screws.

  1. B179761
    Remove the switch.

← REMOVAL (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →