2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. REMOVE NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
(Click here)

2. REMOVE DPF SWITCH ASSEMBLY

  1. A271248
    Detach the 4 claws and remove the No. 2 switch hole base.

  1. A271249
    Detach the 2 claws and remove the DPF switch.

← COMPONENTS (from Jan 2012)INSPECTION (from Jan 2012) →