INSTALLATION
Removal / installation · Vehicles built from Sep 2011
| 1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY |
![]() ![]() |
Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration.
- Torque:
- 14 N*m{ 143 kgf*cm , 10 ft.*lbf }
Connect the 2 connectors.
| 2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY |
![]() ![]() |
Turn the control shaft lever RH of the park/neutral position switch counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
Move the shift lever to N.
Temporarily install the floor shift gear shifting rod with the nut.

Tighten the nut while lightly pushing the lever rearward.
- Torque:
- 13 N*m{ 130 kgf*cm , 9 ft.*lbf }
| 3. INSTALL REAR CONSOLE BOX SUB-ASSEMBLY (w/o Cool Box) |
| 4. INSTALL COOLING BOX ASSEMBLY (w/ Cool Box) |


