2011-2013 Land Cruiser · Service Manual Suspension

INSPECTION

Inspection · Vehicles built from Sep 2011


INSPECT FRONT SUSPENSION UPPER ARM ASSEMBLY LH

G020170
  1. As shown in the illustration, flip the ball joint stud back and forth 5 times, before installing the nut.

  1. Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per 1 turn and take the torque reading on the fifth turn.

    Standard turning torque:
    0.98 to 4.41 N*m (1.0 to 45 kgf*cm, 9 to 39 in.*lbf)

← DISASSEMBLY (from Sep 2011)REASSEMBLY (from Sep 2011) →