2011-2013 Land Cruiser · Service Manual Vehicle Interior

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

HINT:
  1. Use the same procedures for LHD and RHD vehicles.
  2. The procedures listed below are for LHD vehicles.


1. INSTALL HOOD LOCK ASSEMBLY

  1. B216413E01
    Apply MP grease to the sliding areas of the lock.

  1. B180875
    Connect the hood lock control cable.

  1. B216407
    Connect the connector.

  1. Install the hood lock with the 2 bolts and nut.

    Torque:
    5.5 N*m{ 57 kgf*cm , 49 in.*lbf }

  1. Install a new hood lock nut cap.


2. INSTALL HOOD LOCK CONTROL CABLE COVER

B180872
  1. Attach the claw to install the cover.

  1. Install the 3 screws.


3. INSTALL RADIATOR GRILLE

  1. Install the radiator support seal with the 7 clips.

    B180890E02


4. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. for Gasoline Engine:
    Install the upper radiator support seal (Click here).

  1. for Diesel Engine:
    Install the upper radiator support seal (Click here).

← INSPECTION (from Sep 2011)INSTALLATION (from Jan 2012) →