2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

NOTICE:
When replacing the injectors (including shuffling the injectors between the cylinders), common rail, cylinder head, or intake manifold, it is necessary to replace the injection pipes with new ones.


1. INSTALL NO. 2 INTAKE MANIFOLD

  1. A174810
    Install a new gasket and the No. 2 intake manifold with the 9 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


2. INSTALL NO. 1 INTAKE MANIFOLD

  1. A174809
    Install a new gasket and the No. 1 intake manifold with the 9 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


3. INSTALL NO. 1 WATER BY-PASS PIPE

  1. A174808E01
    Temporarily install a new gasket and the No. 1 water by-pass pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    59 N*m{ 600 kgf*cm , 43 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


4. INSTALL FUEL COOLER ASSEMBLY

  1. A176378
    Install the fuel cooler with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


5. CONNECT NO. 6 WATER BY-PASS HOSE

A174806

6. INSTALL NO. 4 NOZZLE LEAKAGE PIPE

  1. A174805E01
    Temporarily install a new gasket and the No. 4 nozzle leakage pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the No. 2 fuel hose to the fuel cooler.


7. INSTALL NO. 3 NOZZLE LEAKAGE PIPE

  1. A174804E01
    Temporarily install a new gasket and the No. 3 nozzle leakage pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the No. 1 fuel hose to the fuel cooler.


8. INSTALL EGR COOLER INSULATOR (w/ EGR System)

A174803

9. INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER (w/ EGR System)

  1. A174802
    Connect the No. 5 water by-pass hose to the water by-pass outlet.

  1. A174801E01
    Install 2 new gaskets and the EGR valve with EGR cooler with the 6 bolts labeled A and 4 bolts labeled B shown in the illustration.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

    HINT:
    The gasket claws should face toward the No. 1 and No. 2 EGR pipes.


10. INSTALL EGR PIPE INSULATOR (w/ EGR System)

  1. A174800
    Install the EGR pipe insulator with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    If the No. 1 and No. 2 EGR pipe insulator installation stay is deformed, or the bolt holes of the EGR pipe insulator do not align, replace the No. 1 and No. 2 EGR pipes as a set.


11. INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR System)

A174799

12. INSTALL NO. 3 INTAKE MANIFOLD

A174867E01
  1. Set 2 new gaskets to the No. 1 and No. 2 intake manifolds.

  1. Install the No. 3 intake manifold with the 16 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Bolt Length 
    Item
    Length
    Bolt A
    25 mm (0.984 in.)
    Bolt B
    70 mm (2.76 in.)


13. CONNECT NO. 2 ENGINE WIRE

  1. A174797E01
    Connect the No. 2 engine wire with the 3 bolts.

    Torque:
    for bolt A:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }
    for bolt B:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

  1. Attach the 2 wire harness clamps.


14. INSTALL INTAKE PIPE

  1. A174796
    w/ EGR System:
    Install 2 new gaskets and the intake pipe with the 6 bolts and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A180252
    w/o EGR System:
    Install a new gasket and the intake pipe with the 4 bolts and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


15. INSTALL NO. 2 INTAKE MANIFOLD INSULATOR (w/ Intercooler)

A174791

16. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR (w/ Intercooler)

A174795

17. INSTALL COMMON RAIL ASSEMBLY RH

  1. A176411
    Install the common rail with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


18. INSTALL INJECTION PIPE RH

  1. A174793
    Using a union nut wrench, install the 4 new injection pipes.

    Torque:
    without union nut wrench:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }
    with union nut wrench:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }

    NOTICE:
    Make sure there is no damage or foreign matter on the seal surfaces.


    HINT:
    A185179E01
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
    2. Make sure the union nut wrench and the torque wrench are connected in a straight line.

  1. A174788
    w/ Intercooler:
    Install the 4 injection pipe clamps with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


19. INSTALL NO. 5 INJECTION PIPE SUB-ASSEMBLY

  1. A174696
    Temporarily install a new No. 5 injection pipe by hand.

    NOTICE:
    Make sure there is no damage or foreign matter on the seal surfaces.

  1. A185242
    Temporarily install the used gasket and No. 2 fuel pipe with the nut, bolt and union bolt.

  1. A185243
    Temporarily install the No. 2 injection pipe clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. A174696
    Using a union nut wrench, tighten the No. 5 injection pipe ends.

    Torque:
    without union nut wrench:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }
    with union nut wrench:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }


    HINT:
    A185179E01
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
    2. Make sure the union nut wrench and the torque wrench are connected in a straight line.

  1. A185243
    Remove the bolt and No. 2 injection pipe clamp.

  1. A185242
    Remove the union bolt and gasket.

  1. Remove the bolt, nut and No. 2 fuel pipe.


20. CONNECT FUEL PUMP MOTOR WIRE

  1. A174792
    Install the fuel pump motor wire bracket to the No. 3 intake manifold with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the connector to the fuel supply pump.


21. INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE SUB-ASSEMBLY

  1. A174697
    Install the fuel filter to injection pump fuel pipe with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 2 hoses to the fuel pipe.


22. INSTALL COMMON RAIL ASSEMBLY LH

  1. A176404
    Install the common rail with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


23. INSTALL INJECTION PIPE LH

  1. A174789
    Using a union nut wrench, install the 4 new injection pipes.

    Torque:
    without union nut wrench:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }
    with union nut wrench:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }

    NOTICE:
    Make sure there is no damage or foreign matter on the seal surfaces.


    HINT:
    A185179E01
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
    2. Make sure the union nut wrench and the torque wrench are connected in a straight line.

  1. A174694
    w/ Intercooler:
    Install the 4 injection pipe clamps with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


24. CONNECT NO. 6 INJECTION PIPE SUB-ASSEMBLY

  1. A185542
    w/ EGR System:

    1. Temporarily install a new No. 6 injection pipe to the common rail LH and RH.

      NOTICE:
      Make sure there is no damage or foreign matter on the seal surfaces.

    2. Install the 2 No. 2 injection pipe clamps with the 2 nuts.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    3. Using a union nut wrench, tighten the No. 6 injection pipe ends.

      Torque:
      without union nut wrench:
      34 N*m{ 347 kgf*cm , 25 ft.*lbf }
      with union nut wrench:
      31 N*m{ 316 kgf*cm , 23 ft.*lbf }


      HINT:
      A185179E01
      1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
      2. Make sure the union nut wrench and the torque wrench are connected in a straight line.

  1. A174695
    w/o EGR System:

    1. Temporarily install a new No. 6 injection pipe to the common rail LH and RH.

      NOTICE:
      Make sure there is no damage or foreign matter on the seal surfaces.

    2. Install the bracket to the No. 3 intake manifold with the bolt.

      Torque:
      10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    3. Install the No. 2 injection pipe clamp with the nut.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    4. Using a union nut wrench, tighten the No. 6 injection pipe ends.

      Torque:
      without union nut wrench:
      34 N*m{ 347 kgf*cm , 25 ft.*lbf }
      with union nut wrench:
      31 N*m{ 316 kgf*cm , 23 ft.*lbf }


      HINT:
      A185179E01
      1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
      2. Make sure the union nut wrench and the torque wrench are connected in a straight line.


25. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY

NOTICE:
A174693E01
Check for damage and foreign matter on the fuel pipe installation surface of the supply pump.
If there is foreign matter, remove it from the installation surface. If the installation surface is damaged, replace the fuel supply pump.

  1. Temporarily install a new gasket and the No. 2 fuel pipe with the union bolt, nut and bolt.

  1. Tighten the union bolt, nut and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    10 N*m{ 105 kgf*cm , 8 ft.*lbf }
    for bolt and nut:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the No. 2 injection pipe clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the fuel hose to the No. 5 nozzle leakage pipe.


26. CONNECT ENGINE WIRE

  1. LH Side:

    1. A174756E01
      Install the engine wire protector with the 2 bolts labeled A.

    2. Connect the 8 connectors.

    3. Install the engine wire harness bracket with the bolt labeled B.

    4. for RHD:
      Connect the wire harness with the wire harness clamp holder labeled C.

    5. A174755
      Attach the 3 wire harness clamps and connect the 2 connectors.

    6. A174754
      Attach the 3 wire harness clamps and connect the 4 connectors.

  1. RH Side:

    1. A174750E01
      Install the engine wire harness protector with the 3 bolts labeled A.

    2. Connect the 7 connectors.

    3. Attach the wire harness clamp.

    4. Install the wire harness bracket with the bolt labeled B.

    5. Install the glow plug wire harness labeled C with the nut.

      Torque:
      4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    6. A174759
      for RHD:
      Connect the wire harness with the wire harness clamp holder.

  1. Rear Side:

    1. A174757E01
      Install the glow plug wire harness with the nut labeled A.

      Torque:
      4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    2. Connect the 2 common rail connectors.

    3. Install the engine wire harness protector with the 2 bolts labeled B.

    4. Install the 2 ground wires with the 2 bolts labeled C.

      Torque:
      8.4 N*m{ 87 kgf*cm , 74 in.*lbf }

    5. Attach the wire harness clamp.


27. INSTALL NO. 4 WATER BY-PASS PIPE

  1. A174691
    w/ EGR System:
    Connect the 4 water hose ends, and temporarily install the No. 4 water by-pass pipe with the 2 bolts and nut.

  1. First tighten the 2 bolts and then tighten the nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A174692
    w/o EGR System:
    Connect the 3 water hose ends, and temporarily install the No. 4 water by-pass pipe with the 2 bolts and nut.

  1. First tighten the 2 bolts and then tighten the nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


28. INSTALL NO. 3 WATER BY-PASS PIPE (w/o Viscous Heater)

  1. A174688
    Connect the 2 water hose ends, and install the No. 3 water by-pass pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


29. CONNECT FUEL HOSE

A174685E01

30. INSTALL NO. 1 AIR CLEANER PIPE SUB-ASSEMBLY

  1. A174714
    Connect the No. 1 air cleaner pipe to the No. 1 intake air connector pipe.

  1. Install the pipe with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }


31. INSTALL HEATER WATER PIPE SUB-ASSEMBLY (w/ Viscous Heater)

  1. A174689
    Connect the 4 water hose ends, and install the water pipe with the 4 bolts.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }


32. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY

  1. A174711
    Connect the No. 2 air cleaner pipe to the No. 2 intake air connector pipe.

  1. Connect the ventilation hose to the oil separator.

  1. Install the pipe with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }


33. INSTALL NO. 4 AIR TUBE

  1. A174723E01
    Install the No. 4 air tube with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. A174690
    Install the suction hose with the bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }


34. INSTALL NO. 2 AIR HOSE

  1. A177379E01
    Connect the No. 2 air hose with the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    1. Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 3 mm (0 to 0.118 in.).
    2. Position the clamp so that distance A is 2 to 6 mm (0.0787 to 0.236 in.).
    3. Make sure the direction of the hose clamp is as shown in the illustration.


35. INSTALL NO. 3 AIR TUBE

  1. A174722E01
    Install the No. 3 air tube with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. A174752
    Install the wire harness bracket with the bolt.

  1. A174751
    Install the ground wire with the nut, and attach the wire harness clamp.

    Torque:
    8.4 N*m{ 87 kgf*cm , 74 in.*lbf }


36. INSTALL NO. 1 AIR HOSE

  1. A177378E01
    Connect the No. 1 air hose with the hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    1. Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 3 mm (0 to 0.118 in.).
    2. Position the clamp so that distance A is 2 to 6 mm (0.0787 to 0.236 in.).
    3. Make sure the direction of the hose clamp is as shown in the illustration.


37. INSTALL INTAKE AIR CONNECTOR

  1. A174710
    Connect the intake air connector to the No. 1 and No. 2 air cleaner pipes.

  1. Install the connector with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 hose clamps.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

  1. A174749E01
    Attach the 3 wire harness clamps.

  1. w/o Viscous Heater:
    Connect the connector to the water temperature sensor.

  1. w/ Viscous Heater:
    Connect the 2 connectors to the water temperature sensor and viscous with magnet clutch heater.


38. TEMPORARILY INSTALL NO. 1 AIR CLEANER HOSE

  1. A177380
    Temporarily install the air cleaner hose to the intake air connector.


39. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  1. A174698
    Connect the air cleaner cap to the air cleaner hose, and install the air cleaner cap with the 4 clamps.

  1. Connect the mass air flow meter connector and attach the wire harness clamp to the air cleaner cap.

  1. Attach the wire harness clamp.

  1. A177377
    Align the protrusion of air cleaner cap and concave portion of air cleaner hose.

  1. Tighten the 2 hose clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


40. INSTALL DIESEL THROTTLE BODY ASSEMBLY LH

A163131
  1. Install a new gasket to the intake pipe.

  1. Install the throttle body with the 2 bolts and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle position sensor connector.

  1. Connect the throttle motor connector.


41. INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET

  1. A163348
    Install the bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A185145
    for Manual Transmission:

    1. Connect the clutch tube to release cylinder 2 way with the bolt.

      Torque:
      20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    2. Check that the union nut is tightened to the specified torque.

      Torque:
      without union nut wrench:
      15 N*m{ 154 kgf*cm , 11 ft.*lbf }
      with union nut wrench:
      14 N*m{ 141 kgf*cm , 10 ft.*lbf }


42. INSTALL NO. 1 GAS FILTER

  1. A163347
    Install the gas filter.

  1. Connect the hose to the intake pipe.


43. INSTALL TUBE CONNECTOR TO FLEXIBLE HOSE TUBE (for Manual Transmission)

A182469
  1. Temporarily install the flare nut of the tube connector to flexible hose tube to the clutch tube to release cylinder 2 way by hand.

  1. A177031E01
    Temporarily install the tube connector to flexible hose tube with the 2 bolts.

  1. Tighten the bolt labeled A.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Tighten the bolt labeled B after installing the clutch hose.


44. INSTALL AIR TUBE SUB-ASSEMBLY LH

A181564E01
  1. Install the air tube to the throttle body.

  1. Align the embossed mark of the throttle body with the paint mark of the No. 4 air hose.

  1. A163828E03
    Tighten the hose clamp so that it is 7 to 11 mm (0.276 to 0.433 in.) from the end of the hose as shown in the illustration.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }


45. INSTALL CLUTCH HOSE (for Manual Transmission)

  1. A182467E01
    Connect the clutch hose to the air tube with the bolt labeled A.

  1. Temporarily install the clutch hose to the clutch master cylinder tube to flexible hose tube and tube connector to flexible hose tube, and fix it in place with the 2 clips.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the bolt labeled B.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the flexible hose tube.

    NOTICE:
    1. Do not bend or damage the flexible hose tube.
    2. Do not allow any foreign matter such as dirt and dust to enter the flexible hose tube from the connecting points.

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). If using a torque wrench with a length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure union nut wrench and the wrench are connected in a straight line.


    1. A177033E01
      Using a 10 mm union nut wrench, tighten the 2 flare nuts of the flexible hose tube.

      Torque:
      without union nut wrench:
      15 N*m{ 154 kgf*cm , 11 ft.*lbf }
      with union nut wrench:
      14 N*m{ 141 kgf*cm , 10 ft.*lbf }

    2. A184226E01
      Using a 10 mm union nut wrench, tighten the flare nut of the flexible hose tube.

      Torque:
      without union nut wrench:
      15 N*m{ 154 kgf*cm , 11 ft.*lbf }
      with union nut wrench:
      14 N*m{ 141 kgf*cm , 10 ft.*lbf }


46. INSTALL DIESEL THROTTLE BODY ASSEMBLY RH

A163132
  1. Install a new gasket to the intake pipe.

  1. Install the throttle body with the 2 bolts and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle position sensor connector.

  1. Connect the throttle motor connector.


47. INSTALL AIR TUBE SUB-ASSEMBLY RH

A181563E01
  1. Install the air tube to the throttle body.

  1. Align the embossed mark of the throttle body with the paint mark of the No. 4 air hose.

  1. A163828E03
    Tighten the hose clamp so that it is 7 to 11 mm (0.276 to 0.433 in.) from the end of the hose as shown in the illustration.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }


48. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE

  1. A170321
    Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the No. 2 engine oil level dipstick guide.

  1. Install the No. 2 engine oil level dipstick guide with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the ventilation hose to the cylinder head cover RH.

  1. A174875
    Connect the wire harness clamp to the No. 2 engine oil level dipstick guide bracket.


49. CONNECT WATER HOSE SUB-ASSEMBLY

A174687E01

50. INSTALL NO. 2 COOL AIR INLET (w/o Intercooler)

  1. A257096E01
    Install a new gasket to the air tube LH.

    HINT:
    Install the gasket with the protrusion facing as shown in the illustration.

  1. A257029
    Install the No. 2 cool air inlet with the 3 nuts and bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A257031E01
    Connect the No. 2 air hose to the No. 2 cool air inlet.

  1. Tighten the No. 2 air hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    1. Align the paint mark of the air hose with the protrusion and push on the air hose so that distance B is 0 to 3 mm (0 to 0.118 in.).
    2. Position the clamp so that distance A is 2 to 6 mm (0.0787 to 0.236 in.).
    3. Make sure the direction of the hose clamp is as shown in the illustration.


51. INSTALL NO. 1 COOL AIR INLET (w/o Intercooler)

  1. A257095E01
    Install a new gasket to the air tube RH.

    HINT:
    Install the gasket with the protrusion facing as shown in the illustration.

  1. A257028
    Install the No. 1 cool air inlet with the 3 nuts and bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the vacuum hose, intake air temperature sensor connector and turbo pressure sensor connector.

  1. A257030E01
    Connect the No. 1 air hose to the No. 1 cool air inlet.

  1. Tighten the No. 1 air hose clamp.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

    HINT:
    1. Align the paint mark of the air hose with the protrusion and push on the air hose so that distance B is 0 to 3 mm (0 to 0.118 in.).
    2. Position the clamp so that distance A is 2 to 6 mm (0.0787 to 0.236 in.).
    3. Make sure the direction of the hose clamp is as shown in the illustration.


52. INSTALL INTERCOOLER ASSEMBLY (w/ Intercooler)
  1. Install the intercooler assembly (Click here).


53. BLEED CLUTCH LINE

C172957
  1. Remove the release cylinder bleeder plug cap.

  1. Connect a vinyl tube to the bleeder plug.

  1. Depress the clutch pedal several times, and then loosen the bleeder plug while the pedal is depressed.

  1. When fluid no longer comes out, tighten the bleeder plug, and then release the clutch pedal.

  1. Repeat the previous 2 steps until all the air in the fluid is completely bled.

  1. Tighten the bleeder plug.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }

  1. Install the bleeder plug cap.

  1. Check that all the air has been bled from the clutch line.


54. CHECK FOR CLUTCH FLUID LEAK

55. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Connect the cables to the negative (-) main battery and sub-battery terminals.


56. ADD ENGINE COOLANT

  1. A179103
    Remove the engine air bleed cap.

  1. A185226
    Connect a clear hose to the engine air bleed pipe.

  1. A177426
    Using a wrench, remove the vent plug.

  1. A177425
    Fill the radiator with TOYOTA SLLC to the radiator reservoir filler neck.

    HINT:
    Pour TOYOTA SLLC until it spills out of the engine air bleed pipe.

    Standard Capacity (for Automatic Transmission):
    Item
    Specified Condition
    Front heater only
    14.8 liters (15.6 US qts, 13.0 Imp. qts)
    Front heater and rear heater
    17.6 liters (18.6 US qts, 15.5 Imp. qts)
    Front heater with viscous heater
    15.2 liters (16.1 US qts, 13.4 Imp. qts)
    Front heater and rear heater with viscous heater
    18.0 liters (19.0 US qts, 15.4 Imp. qts)

    Standard capacity (for Manual Transmission):
    15.4 liters (16.3 US qts, 13.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. A177426
    Install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

    NOTICE:
    Do not tighten the plug to 5.0 N*m (51 kgf*cm, 44 in.*lbf) or more, as the plug will be damaged.

  1. A185226
    Disconnect the clear hose from the engine air bleed pipe.

  1. A179103
    Install the engine air bleed cap when coolant comes out.

  1. Install the radiator reservoir cap.

  1. Start the engine.

    NOTICE:
    Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.

  1. Maintain an engine speed of 3000 rpm for approximately 10 minutes so that the thermostat opens and air bleeding is performed.

    CAUTION:
    When pressing the radiator hoses:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the radiator fan

    NOTICE:
    1. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    2. If there is not enough coolant, the engine may burn out or overheat.

    HINT:
    The thermostat opening timing can be confirmed by pressing the No. 2 radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174740
    Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.


57. INSPECT FOR FUEL LEAK
  1. Perform Active Test.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to ON.

    3. Start the engine.

    4. Turn the intelligent tester ON.

    5. Enter the following menus: Powertrain / Engine and ECT / Active Test.

    6. Perform the Active Test.

      Tester Display
      Test Detail
      Control Range
      Diagnostic Note
      Test the Fuel Leak
      Pressurizes fuel inside common rail and checks for fuel leaks
      Stop/Start
      1. The fuel inside the common rail is pressurized to the specified value and the engine speed increases to 2000 rpm when Start is selected.
      2. The above conditions are preserved while Start is selected.


58. CHECK FOR ENGINE COOLANT LEAK

CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174739
    Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 17.8 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and cylinder head.


59. INSPECT FOR OIL LEAK

60. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. Install the upper radiator support seal with the 7 clips.


61. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  1. A178461
    Install the engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


62. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

  1. A174148
    Install the splash shield with the clip, and then install the 3 bolts and screw.


63. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
  1. Install the splash shield with the clip, and then install the 3 bolts and screw.

← INSPECTION (from Sep 2011)INSTALLATION (from Jan 2012) →