2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REMOVE NO. 1 AND NO. 2 EGR VALVE ASSEMBLIES
(Click here)

2. REMOVE NO. 3 WATER BY-PASS PIPE

  1. A163653
    Remove the bolt and disconnect the 2 hoses to remove the No. 3 water by-pass pipe.


3. REMOVE NO. 8 WATER BY-PASS HOSE

  1. A165501
    Remove the 2 No. 8 water by-pass hoses.


4. REMOVE STUD BOLT

  1. A165225
    Using an E6 "TORX" socket wrench, remove the 4 stud bolts from the EGR cooler.

← REMOVAL (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →