2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REMOVE NO. 1 AND NO. 2 EGR VALVE ASSEMBLIES
  1. Remove the No. 1 and No. 2 EGR valve assemblies (Click here).


2. REMOVE NO. 3 WATER BY-PASS PIPE

  1. A163653
    Remove the bolt and disconnect the 2 hoses to remove the water by-pass pipe.


3. REMOVE NO. 8 WATER BY-PASS HOSE

  1. A165501
    Remove the 2 hoses.


4. REMOVE STUD BOLT

  1. A165225
    Using an E6 "TORX" socket wrench, remove the 4 stud bolts from the EGR cooler.

← COMPONENTS (from Jan 2012)REMOVAL (from Jan 2012) →