2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

NOTICE:
  1. Before performing these installation procedures, sufficiently clean and remove any foreign matter from the cylinder block, cylinder head, camshaft and other parts.
  2. When replacing an injector (including interchanging injectors between cylinders), common rail, cylinder head, or intake manifold, replace the corresponding injection pipes with a new one.


1. CHECK INJECTOR COMPENSATION CODE

A141119E02

NOTICE:
  1. When a fuel injector is replaced, the new fuel injector compensation code must be input into the ECM. When the ECM is replaced, all of the existing fuel injector compensation codes must be input into the new ECM.
  2. Fuel injector compensation codes are unique, 30 digit, alphanumeric values printed on the head portion of each fuel injector. If an incorrect fuel injector compensation code is input into the ECM, the engine assembly may rattle or engine idling may become rough. In addition, engine failure may occur and the life of the engine may be shortened.

  1. After replacing fuel injector(s) with new one(s), input compensation code(s) of fuel injector(s) into ECM as follows:

    HINT:
    1. Each fuel injector has different fuel injection characteristics. In order to optimize the fuel injections, the ECM uses the compensation codes to balance the different fuel injections between each fuel injector.
    2. When you first turn the ignition switch to ON after replacing the ECM or a fuel injector(s), DTC P1601 is set. This is to inform you that registration of a fuel injector compensation code(s) is/are required. Manually clear the DTC upon completion of the compensation code registration.


    1. Input the compensation code(s), which is/are imprinted on the head portion(s) of the new fuel injector(s), into the intelligent tester.

    2. Input the new compensation code(s) into the ECM using the tester.

    3. Turn the tester off and turn the ignition switch off.

    4. Wait for at least 30 seconds.

    5. Turn the ignition switch to ON and turn the tester on.

    6. Clear DTC P1601 stored in the ECM using the tester (Click here).

  1. Register compensation code.

    A169590E04

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to ON.

      NOTICE:
      Do not start the engine.

    3. Turn the tester on.

    4. G036522E01
      Enter the following menus: Powertrain / Engine / Utility / Injector Compensation.

    5. Press Next.

    6. G036523E01
      Press Next again to proceed.

    7. G036528E01
      Select "Set Compensation Code".

    8. Press Next.

    9. A166685
      Select the number of the cylinder corresponding to the fuel injector compensation code that you want to read.

    10. Press Next.

    11. G036529E01
      Register compensation code.
      1. Press Input.

      2. A168951
        Manually input the cylinder compensation code using the keyboard on the tester screen. The code is a 30 digit, alphanumeric value printed on the injector head portion.

        HINT:
        Each fuel injector compensation code is unique. The compensation code for each selected cylinder must be input into the tester correctly.

      3. Confirm that the compensation code for the selected cylinder is correct, and then press OK.

    12. G036531E01
      Check that the compensation code displayed on the screen is correct by comparing it with the 30 digit alphanumeric value on the head portion of the fuel injector.

      NOTICE:
      If an incorrect fuel injector compensation code is input into the ECM, the engine may rattle or engine idling may become rough. In addition, engine failure may occur and the life of the engine may be shortened.

      HINT:
      1. If a wrong compensation code is input or read, return to the Input Value screen by pressing Input.
      2. The saving process may fail due to a problem with the wire harness or a bad connection with the DLC3. Check the wire harness and DLC3 connection. If no problem is found with either, the ECM may be malfunctioning. Check the ECM and repeat this operation.

    13. Press Next to register the compensation code in the ECM.

      HINT:
      1. If the registration process fails, the compensation code may be incorrect. Check the compensation code again.
      2. If the input compensation code fails to register even though it is input correctly, there may be a problem with the wire harness or a bad connection with the DLC3. Check the wire harness and DLC3 connection. If no problem is found with either, the ECM may be malfunctioning. Check the ECM and restart this operation.

    14. G036532E01
      If you want to continue with other compensation code registrations, press Next. To finish the registration, press Cancel.

    15. Turn the ignition switch off and then turn the tester off.

    16. Wait for at least 30 seconds.

    17. Turn the ignition switch to ON and then turn the tester on.

    18. Clear DTC P1601 stored in the ECM using the tester (Click here).


2. SELECT CYLINDER HEAD GASKET
  1. Set the 2 crankshaft pulley set bolts to the crankshaft.

  1. Clean the cylinder block with solvent.

  1. Inspect the protrusion for each cylinder.

    1. Set the piston of the cylinder to be measured to slightly before TDC.

    2. A164862
      Place a dial indicator on the cylinder block, and set the measuring tip as shown in the illustration.

      NOTICE:
      Make sure that the dial indicator is at a right angle to the cylinder block top surface.

    3. Set the dial indicator at 0 mm (0 in.).

      HINT:
      Make sure that the measuring tip is flat against the cylinder block surface and piston head when taking the measurements.

    4. Find where the piston head protrudes most by slowly turning the crankshaft clockwise and counterclockwise.

    5. Measure the piston protrusion value of each cylinder at 2 places as shown in the illustration below, making a total of 8 measurements.

      Standard piston protrusion:
      0.520 to 0.780 mm (0.0205 to 0.0307 in.)

      If the protrusion is not as specified, remove and reinstall the piston and connecting rod.

      A182771E01

  1. A182770E01
    Select a new cylinder head gasket.

    HINT:
    Cylinder head gaskets are marked A, B, C, D or E accordingly.

    New Installed Cylinder Head Gasket Thickness:
    Item
    Cutout
    Specified Condition*
    A
    1
    1.20 to 1.30 mm (0.0472 to 0.0512 in.)
    B
    2
    1.25 to 1.35 mm (0.0492 to 0.0394 in.)
    C
    3
    1.30 to 1.40 mm (0.0512 to 0.0551 in.)
    D
    4
    1.35 to 1.45 mm (0.0531 to 0.0571 in.)
    E
    5
    1.40 to 1.50 mm (0.0551 to 0.0591 in.)

    HINT:
    *: The specified condition indicates the thickness of the gasket after tightening the cylinder head.


    1. Select the largest piston protrusion value from the measurements and then select a new appropriate gasket according to the table below.

      Standard Piston Protrusion:
      Item
      Specified Condition
      A
      0.520 to 0.575 mm (0.0205 to 0.0226 in.)
      B
      0.575 to 0.625 mm (0.0226 to 0.0246 in.)
      C
      0.625 to 0.675 mm (0.0246 to 0.0266 in.)
      D
      0.675 to 0.725 mm (0.0266 to 0.0285 in.)
      E
      0.725 to 0.780 mm (0.0285 to 0.0307 in.)


3. INSTALL NO. 2 CYLINDER HEAD GASKET

  1. A164880E01
    Remove any oil from the contact surface.

  1. Place the cylinder head gasket on the cylinder block surface with the front face of the indicated mark "L" upward and facing the exhaust side.


4. INSTALL NO. 1 CYLINDER HEAD GASKET

  1. A164879E01
    Remove any oil from the contact surface.

  1. Place the cylinder head gasket on the cylinder block surface with the front face of the indicated mark "R" upward and facing the exhaust side.


5. INSTALL CYLINDER HEAD SUB-ASSEMBLY LH
  1. Place the cylinder head on the cylinder head gasket.

    NOTICE:
    Ensure that no oil is on the mounting surface of the cylinder head.

  1. Inspect the cylinder head bolts (Click here).

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.

  1. Step 1:

    1. A164541E02
      Install and uniformly tighten the 10 cylinder head bolts with the spacers in several steps, in the sequence shown in the illustration.

      Torque:
      80 N*m{ 816 kgf*cm , 59 ft.*lbf }

      HINT:
      1. The cylinder head bolts are tightened in 4 progressive steps.
      2. If a cylinder head bolt is broken or deformed, replace it.

  1. A158686E01
    Step 2:

    1. Mark the cylinder head bolt heads with paint as shown in the illustration.

    2. Tighten the cylinder head bolts 90° in the sequence shown in step 1.

  1. A164864E01
    Step 3:

    1. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

  1. A164864E01
    Step 4:

    1. Tighten the cylinder head bolts by an additional 90° in the sequence shown in step 1.

  1. Check that the painted marks are now facing the exhaust port side.


6. INSTALL CYLINDER HEAD SUB-ASSEMBLY RH
  1. Place the cylinder head on the cylinder head gasket.

    NOTICE:
    Ensure that no oil is on the mounting surface of the cylinder head.

  1. Inspect the cylinder head bolts (Click here).

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.

  1. Step 1:

    1. A164533E02
      Install and uniformly tighten the 10 cylinder head bolts with the spacers in several steps, in the sequence shown in the illustration.

      Torque:
      80 N*m{ 816 kgf*cm , 59 ft.*lbf }

      HINT:
      1. The cylinder head bolts are tightened in 4 progressive steps.
      2. If a cylinder head bolt is broken or deformed, replace it.

  1. A158686E01
    Step 2:

    1. Mark the cylinder head bolt heads with paint as shown in the illustration.

    2. Tighten the cylinder head bolts 90° in the sequence shown in step 1.

  1. A158687E01
    Step 3:

    1. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

  1. A164864E01
    Step 4:

    1. Tighten the cylinder head bolts by an additional 90° in the sequence shown in step 1.

  1. Check that the painted marks are now facing the intake port side.


7. SET NO. 1 CYLINDER TO 45° BEFORE TDC

  1. A164515
    Using a bar, turn the crankshaft counterclockwise until the No. 1 cylinder is at a position 45° before TDC.

    NOTICE:
    Do not turn the crankshaft again until after the timing gear is installed.

    HINT:
    The No. 1 cylinder is at a position 45° before TDC if the crankshaft counterweight is overlapping the cylinder block hole as shown in the illustration.

  1. Remove the 2 crankshaft pulley set bolts.


8. INSTALL NO. 2 VALVE LASH ADJUSTER ASSEMBLY

NOTICE:
Be sure to inspect the valve lash adjuster before installing it (Click here).

  1. A164540
    Install the 16 No. 2 valve lash adjusters to the cylinder head.

    HINT:
    Install the lash adjuster at the same place it was removed from.


9. INSTALL NO. 1 VALVE LASH ADJUSTER ASSEMBLY

NOTICE:
Be sure to inspect the valve lash adjuster before installing it (Click here).

  1. A164532
    Install the 16 No. 1 valve lash adjusters to the cylinder head.

    HINT:
    Install the lash adjuster at the same place it was removed from.


10. INSTALL NO. 2 VALVE ROCKER ARM

  1. A181682
    Apply engine oil to the lash adjuster tips and valve stem ends.

  1. A164641
    Install the 16 No. 2 valve rocker arms as shown in the illustration.

    HINT:
    Install the valve rocker arm at the same place it was removed from.


11. INSTALL NO. 1 VALVE ROCKER ARM

  1. A181682
    Apply engine oil to the lash adjuster tips and valve stem ends.

  1. Install the 16 No. 1 valve rocker arms as shown in the illustration.

    HINT:
    A164641
    Install the valve rocker arm at the same place it was removed from.


12. INSTALL NO. 5 CAMSHAFT BEARING CAP

  1. A164530
    Align the camshaft bearing cap and the ring pins of the cylinder head, and install the cap.


13. INSTALL NO. 2 CAMSHAFT BEARING CAP

  1. A164538
    Align the camshaft bearing cap and the ring pins of the cylinder head, and install the cap.


14. INSTALL NO. 3 AND NO. 4 CAMSHAFTS

  1. A164904
    Add more than 19 cc (1.16 cu. in.) of engine oil into the cylinder head side oil holes.

  1. A164816
    Apply engine oil to the rollers of the valve rocker arms and the camshaft housing of the cylinder head.

  1. A164520
    Install the camshafts.

    1. Apply engine oil to the camshaft journals, lobes, thrust portion and gears.

    2. Align the timing marks (1 dot mark) on the back side of the No. 3 and No. 4 camshaft timing gears as shown in the illustration.

    3. Place the camshafts into the cylinder head.

      NOTICE:
      A164641
      Before and after setting the camshafts, firmly set the rocker arms to the lash adjusters.

  1. A164794
    Install the No. 4 camshaft bearing cap.

    1. Align the No. 4 camshaft bearing cap and the ring pins of the No. 5 camshaft bearing cap.

    2. Temporarily install the 4 bolts by hand.

  1. A164536
    Install the No. 3 camshaft bearing caps.

    1. Confirm the marks and numbers on the camshaft bearing caps and place them in their proper position and direction.

    2. Temporarily install the 8 bolts, which are not installed with the oil feed pipe, by hand.

  1. A164795
    Temporarily install the No. 3 and No. 4 camshaft oil feed pipes with the 8 bolts by hand.

    NOTICE:
    If even one of the pipe bolt holes does not match its camshaft bearing cap bolt hole, replace the camshaft oil feed pipe.

    HINT:
    The pipe is bent on the intake side, and straight on the exhaust side.

  1. A164783
    Temporarily install the 2 union bolts by hand.

  1. A181662E01
    Uniformly tighten the 20 bolts in several steps in the order shown in the illustration.

    Torque:
    for 12 mm head bolt of No. 4 camshaft bearing cap:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for 10 mm head bolt of No. 3 camshaft bearing cap:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A164783
    Tighten the 2 union bolts.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. A164905
    Remove the bolt from the No. 4 camshaft timing gear.

    NOTICE:
    Do not drop the bolt into the engine.


15. INSTALL NO. 1 AND NO. 2 CAMSHAFT

  1. A164904
    Add more than 19 cc (1.16 cu. in.) of engine oil into the cylinder head side oil holes.

  1. A164816
    Apply engine oil to the rollers of the valve rocker arms and the camshaft housing of the cylinder head.

  1. A164519
    Install the camshafts.

    1. Apply engine oil to the camshaft journals, lobes, thrust portion and gears.

    2. Align the timing marks (2 dot marks) on the back side of the No. 1 and No. 2 camshaft timing gears as shown in the illustration.

    3. Place the camshafts into the cylinder head.

      NOTICE:
      A164641
      Before and after setting the camshafts, firmly set the rocker arms to the lash adjusters.

  1. A164791
    Install the No. 1 camshaft bearing cap.

    1. Align the No. 1 camshaft bearing cap and the ring pins of the No. 2 camshaft bearing cap.

    2. Temporarily install the 4 bolts by hand.

  1. A164527
    Install the No. 3 camshaft bearing caps.

    1. Confirm the marks and numbers on the camshaft bearing caps and place them in their proper position and direction.

    2. Temporarily install the 8 bolts, which are not installed with the oil feed pipe, by hand.

  1. A164792
    Temporarily install the No. 1 and No. 2 camshaft oil feed pipes with the 8 bolts by hand.

    NOTICE:
    If even one of the pipe bolt holes does not match its camshaft bearing cap bolt hole, replace the camshaft oil feed pipe.

    HINT:
    The pipe is bent on the intake side, and straight on the exhaust side.

  1. A164793
    Temporarily install the 2 union bolts by hand.

  1. A181660E01
    Uniformly tighten the 20 bolts in several steps in the order shown in the illustration.

    Torque:
    for 12 mm head bolt of No. 1 camshaft bearing cap:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for 10 mm head bolt of No. 3 camshaft bearing cap:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A164793
    Tighten the 2 union bolts.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. A164905
    Remove the bolt from the No. 1 camshaft timing gear.

    NOTICE:
    Do not drop the bolt into the engine.


16. INSTALL TIMING GEAR CASE SUB-ASSEMBLY

NOTICE:
When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.
A158670E01

  1. Apply seal packing to the timing gear case as shown in the following illustration.

    Standard seal diameter:
    4 to 5 mm (0.157 to 0.197 in.)

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. After applying seal packing, align the timing gear case with the engine within 3 minutes and tighten the bolts and nuts within 15 minutes.
    2. Apply the seal packing in a continuous line.

    HINT:
    1. The FIPG line is shown below.
    2. Apply packing to the 5 seal surface areas.


    A158675E02

  1. A181226E01
    Install a new timing gear case gasket.

  1. Apply engine oil to 2 new O-rings and install them to the timing gear case.

  1. A164512E02
    Install the timing gear case with the 22 bolts and 2 nuts.

    Torque:
    for 14 mm head bolt (case is dry):
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }
    for 14 mm head bolt (case is wet):
    42 N*m{ 428 kgf*cm , 31 ft.*lbf }
    for 12 mm head bolt A and B:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for nut:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

    NOTICE:
    1. The case is "dry" when there is absolutely no engine oil on the 14 mm head bolts and cylinder head bolt holes.
    2. The case is "wet" when there is engine oil on the 14 mm head bolts and cylinder head bolt holes.

    Bolt Length 
    Item
    Quantity
    Length
    A
    4
    20 mm (0.787 in.)
    B
    8
    45 mm (1.77 in.)


17. INSTALL V-BANK SILENCER

  1. A164488
    Align the alignment areas of the V-bank silencer and cylinder block, and install the V-bank silencer.

    NOTICE:
    Verify that the V-bank silencer is below the top surface of the intake port of the cylinder head RH and LH.


18. INSTALL FUEL SUPPLY PUMP ASSEMBLY

  1. A164817
    Using an 8 mm x 1.25 pitch tap, remove the adhesive from the timing gear case side bolt hole.

  1. A164818E01
    Apply adhesive to 2 or more threads of the timing gear case bolt hole.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

  1. A164821E01
    Apply engine oil to a new O-ring and install it to the supply pump.

  1. A158684
    Install the supply pump to the timing gear case.

    NOTICE:
    When installing the supply pump, do not hold the fuel pipe to prevent fuel leaks.


    1. Temporarily install the 2 nuts.

    2. Using a 6 mm hexagon wrench, install the hexagon bolt, and then tighten the 2 nuts.

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }


19. INSPECT RADIAL BALL BEARING

  1. A164845
    Turn the bearing, and check that the bearing moves smoothly and quietly.
    If it moves roughly or noisily, replace the radial ball bearing.


20. TEMPORARILY INSTALL FUEL SUPPLY PUMP DRIVE GEAR

  1. A164525
    Align the cutout of the supply pump drive gear and key of the supply pump, and temporarily install the nut.


21. SET NO. 1 AND NO. 2 CAMSHAFTS TO TDC

  1. A164516
    Using a wrench, turn the No. 1 camshaft and align the timing marks (1 dot mark) on the back side of the timing gears as shown in the illustration.


22. INSTALL NO. 1 IDLE GEAR SHAFT

  1. A164840
    Apply engine oil to the contact surface of the idle gear shaft and the back side of the protrusion.

  1. A164511
    Install the idle gear shaft to the cylinder block.


23. INSTALL IDLE GEAR ASSEMBLY

  1. A170353E01
    Temporarily install the 2 crankshaft pulley set bolts to the crankshaft.

  1. Using a bar, turn the crankshaft clockwise to the No. 1 cylinder TDC position.

  1. Align the timing marks of the supply pump drive gear and idle gear, and the timing marks of the crankshaft timing gear and idle gear as shown in the illustration.

    A257019E01

  1. Apply engine oil to the idle gear thrust plate and gears.

  1. A257018E01
    Install the idle gear thrust plate with the 2 bolts.

    Torque:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }

  1. A180280
    w/ Intercooler:
    Remove the service bolt.


24. TIGHTEN FUEL SUPPLY PUMP DRIVE GEAR NUT

  1. Using SST, hold the idle gear and tighten the nut.

    SST
    09960-10010   (09962-01000, 09963-00700)

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }


    A257020E01


25. CHECK NO. 1 CYLINDER TO TDC/COMPRESSION

  1. Check that the timing marks of the following pairs of parts are aligned: 1) supply pump drive gear and idle gear: 2) crankshaft timing gear and idle gear: 3) RH and LH camshaft timing gears.

    A177357


26. INSTALL NO. 2 CAMSHAFT TIMING SPROCKET AND NO. 2 TIMING CHAIN

  1. A164523
    Align the 2 mark plates (yellow) on the No. 2 timing chain with the timing mark (1 dot mark) of the No. 2 camshaft timing sprocket as shown in the illustration.

  1. A174774E01
    Align the No. 2 timing chain mark plate (yellow) with the supply pump drive gear timing mark, and temporarily install the No. 2 camshaft timing sprocket with the 4 bolts.

  1. A164506E01
    Using SST, hold the No. 2 camshaft timing sprocket, and tighten the 4 bolts.
    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


27. INSTALL NO. 1 CAMSHAFT TIMING SPROCKET AND NO. 1 TIMING CHAIN

  1. A164521
    Align the 2 mark plates (yellow) on the No. 1 timing chain with the timing mark (1 dot mark) of the No. 1 camshaft timing sprocket as shown in the illustration.

  1. A174775E01
    Align the No. 1 timing chain mark plate (yellow) with the supply pump drive gear timing mark, and temporarily install the No. 1 camshaft timing sprocket.


28. INSTALL PUMP DRIVE SHAFT GEAR

  1. A164498E01
    Temporarily install the pump drive shaft gear with the 4 bolts.

  1. Using SST, hold the pump drive shaft gear and tighten the 4 bolts.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


29. INSTALL NO. 2 CHAIN VIBRATION DAMPER

  1. A180675
    Install the No. 2 chain vibration damper with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


30. INSTALL NO. 2 CHAIN TENSIONER SLIPPER

A164504

31. INSTALL NO. 2 CHAIN TENSIONER ASSEMBLY
  1. Move the stopper plate clockwise to release the lock, and push the plunger into the tensioner.

  1. A164589
    Move the stopper plate counterclockwise to set the lock, and insert a hexagon wrench into the stopper plate hole.

  1. A164503
    Install the No. 2 chain tensioner with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Remove the hexagon wrench.


32. INSTALL NO. 1 CHAIN VIBRATION DAMPER

  1. A164501
    Install the No. 1 chain vibration damper with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


33. INSTALL NO. 1 CHAIN TENSIONER SLIPPER

A174767

34. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
  1. Move the stopper plate clockwise to release the lock, and push the plunger into the tensioner.

  1. A164589
    Move the stopper plate counterclockwise to set the lock, and insert a hexagon wrench into the stopper plate hole.

  1. A174766
    Install the No. 1 chain tensioner with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Remove the hexagon wrench.


35. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE

  1. A164913
    Remove the adhesive from the threads of the screws and the bolt holes of the crankshaft.

  1. Apply adhesive to 2 or 3 threads of the 2 screws.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

  1. A174765
    Using a T30 "TORX" wrench, install the No. 1 crankshaft position sensor plate with the 2 screws.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure the "F" mark on the plate is facing towards the front side of the engine.


36. CHECK NO. 1 CYLINDER TO TDC/COMPRESSION
  1. Temporarily install the 2 crankshaft pulley set bolts to the crankshaft.

  1. Rotate the crankshaft 2 revolutions or more so that the crankshaft key is 45° counterclockwise from the top. Check that the timing marks (1 dot mark each) of the RH and LH camshaft timing gears align. If not as specified, turn the crankshaft 1 revolution (360°) and align the timing marks. If the timing marks are deviated, reinstall the chain and camshaft.

    A174764E01

  1. Remove the 2 crankshaft pulley set bolts.


37. INSTALL FRONT CRANKSHAFT OIL SEAL

  1. A164640E01
    Place the timing chain cover on wooden blocks.

  1. Using SST and a hammer, tap in a new oil seal as shown in the illustration.

    SST
    09316-12010  
    09950-70010   (09951-07100)
    09950-60020   (09951-00890)

    Standard depth A:
    0.6 to 1.4 mm (0.0236 to 0.0551 in.)


38. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

NOTICE:
When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.
A158671E01

  1. A174785E01
    Install a new O-ring to the timing gear case.

  1. Apply seal packing to the timing chain cover as shown in the following illustration.

    Standard seal diameter:
    4 to 5 mm (0.157 to 0.197 in.)

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. After applying seal packing, align the timing chain cover with the timing gear case within 3 minutes and tighten the bolts and nuts within 15 minutes.
    2. Apply the seal packing in a continuous line.
    3. Make sure the seal packing does not become thinner than 4 mm (0.157 in.) at the areas labeled "B" in the illustration below.


    HINT:
    1. The FIPG line is shown below.
    2. Apply packing to the 6 seal surface areas.
    A158676E02

  1. Apply engine oil to the lip of the oil seal.

  1. Align and install the timing chain cover to the timing gear case knock pin and supply pump bearing.

    NOTICE:
    Make sure that the lip of the oil seal is properly installed.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


    HINT:
    A168359E01
    If the stud bolts are loose, tighten them before performing this procedure.


    1. Using an E7 "TORX" wrench, tighten the stud bolts.

      Torque:
      6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. A177358E01
    Install and uniformly tighten the 16 bolts and 4 nuts in the order shown in the illustration.


39. TEMPORARILY INSTALL INTAKE MANIFOLD

  1. A177324
    Install the gasket and temporarily install the No. 2 intake manifold with the 9 bolts.

  1. A177323
    Install the gasket and temporarily install the No. 1 intake manifold with the 9 bolts.

  1. A179134E01
    Install the 2 gaskets and temporarily install the No. 3 intake manifold with the 16 bolts.
    Bolt Length 
    Item
    Length
    Bolt A
    70 mm (2.76 in.)
    Bolt B
    25 mm (0.984 in.)


40. TEMPORARILY INSTALL COMMON RAIL ASSEMBLY RH
  1. Install the common rail with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


41. TEMPORARILY INSTALL COMMON RAIL ASSEMBLY LH
  1. Install the common rail with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


42. INSTALL FUEL INJECTOR RH

NOTICE:
Be sure to install the injector, holder clamp and bolt to their original positions.

  1. A164163
    Install 4 new injection nozzle seats to the cylinder head.

  1. A164164E04
    Apply a light coat of clean engine oil to 4 new O-rings.
    Text in Illustration 
    *1
    New O-Ring

  1. Install the O-rings to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. Insert the injector until it touches the nozzle seat surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. For an injector that has been replaced with a new injector, register the injector compensation code.

  1. Temporarily install 4 new washers and the 4 nozzle clamps with the 4 clamp bolts.

    NOTICE:

    1. A164160E07
      The fork portion of the nozzle holder clamp must be set on the injector.
    2. Before tightening the bolts, check that the nozzle holder clamp is set properly.
    3. To tighten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a later step.
    4. When tightening the bolts, be careful not to tilt the bolt and clamp.
    5. Do not reuse the washer.

    Text in Illustration 
    *1
    Washer
    *2
    Nozzle Holder Clamp
    *a
    Downward

  1. A168840
    Temporarily install 4 new injection pipes to the common rail and injector.

  1. A062123E04
    Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces. If scratches or dents are present, replace the nozzle leakage pipe.
    Text in Illustration 
    *1
    Nozzle Leakage Pipe

  1. Set the leakage pipe and 5 new gaskets in place.

  1. A176409
    Temporarily install the leakage pipe with the 4 hollow screws and union bolt.
    Text in Illustration 
    V100136
    Union Bolt

    HINT:
    To position the injectors, loosely tighten the 4 hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Remove the 4 injection pipes.

  1. A165023
    Tighten the 4 hollow screws.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    NOTICE:
    If a hollow screw is accidentally tightened beyond the torque specification, it must be replaced together with the nozzle leakage pipe.

  1. A165024
    Tighten the union bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced together with the nozzle leakage pipe.


43. INSTALL FUEL INJECTOR LH

NOTICE:
Be sure to install the injector, holder clamp and bolt to their original positions.

  1. A164163
    Install 4 new injection nozzle seats to the cylinder head.

  1. A164164E04
    Apply a light coat of clean engine oil to 4 new O-rings.
    Text in Illustration 
    *1
    New O-Ring

  1. Install the O-rings to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. Insert the injector until it touches the nozzle seat surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. For an injector that has been replaced with a new injector, register the injector compensation code.

  1. Temporarily install 4 new washers and the 4 nozzle clamps with the 4 clamp bolts.

    NOTICE:

    1. A164160E07
      The fork portion of the nozzle holder clamp must be set on the injector.
    2. Before tightening the bolts, check that the nozzle holder clamp is set properly.
    3. To tighten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a later step.
    4. When tightening the bolts, be careful not to tilt the bolt and clamp.
    5. Do not reuse the washer.

    Text in Illustration 
    *1
    Washer
    *2
    Nozzle Holder Clamp
    *a
    Downward

  1. A163353
    Temporarily install the common rail LH with the 2 bolts.

  1. A168840
    Temporarily install 4 new injection pipes to the common rail and injector.

  1. A062123E05
    Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces. If scratches or dents are present, replace the nozzle leakage pipe.
    Text in Illustration 
    *1
    Nozzle Leakage Pipe

  1. Set the leakage pipe and 5 new gaskets in place.

  1. A176410
    Temporarily install the leakage pipe with the 4 hollow screws and union bolt.
    Text in Illustration 
    V100136
    Union Bolt

    HINT:
    To position the injectors, loosely tighten the 4 hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Remove the 4 injection pipes.

  1. Remove the 2 bolts and common rail LH.

  1. A165056
    Tighten the 4 hollow screws.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    NOTICE:
    If a hollow screw is accidentally tightened beyond the torque specification, it must be replaced together with the nozzle leakage pipe.

  1. A165057
    Tighten the union bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced together with the nozzle leakage pipe.


44. REMOVE COMMON RAIL ASSEMBLY RH

  1. A271236E01
    Remove the 2 bolts and common rail.
    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

    NOTICE:
    Do not remove the fuel pressure sensor from the common rail. If it is removed, replace the common rail.


45. REMOVE COMMON RAIL ASSEMBLY LH

  1. A271235E01
    Remove the 2 bolts and common rail.
    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

    NOTICE:
    1. Do not remove the fuel pressure limiter from the common rail. If it is removed, replace the common rail.
    2. w/ DPF:
      Do not remove the pressure discharge valve from the common rail. If it is removed, replace the common rail.


46. REMOVE INTAKE MANIFOLD

  1. A179134
    Remove the 16 bolts, 2 gaskets and intake manifold.

  1. A177323
    Remove the 9 bolts, No. 1 intake manifold and gasket.

  1. A177324
    Remove the 9 bolts, No. 2 intake manifold and gasket.


47. INSTALL NOZZLE HOLDER GASKET LH

  1. A174978E02
    Press 4 new nozzle holder gaskets into the cylinder head cover LH.

    NOTICE:
    After installing the nozzle holder gasket, check that it does not protrude from the cylinder head cover.

    Text in Illustration 
    *1
    Nozzle Holder Gasket


48. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH

  1. A164159
    Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100135
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after the installation.

  1. Install a new gasket to the cylinder head cover.

    NOTICE:
    Remove any oil from the contact surface.

  1. A174973E01
    Temporarily install the cylinder head cover with the 17 bolts. Tighten the 17 bolts in the order shown in the illustration.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    After tightening the bolts, check that the bolts at step 11 and 19 are tightened to the specified torque.


49. INSTALL NOZZLE HOLDER SEAL LH
  1. Press 4 new holder seals into the cylinder head cover LH.


50. INSTALL OIL SEPARATOR ASSEMBLY
  1. Install a new gasket to the oil separator.

    NOTICE:
    Remove any oil from the contact surface.

  1. Install the oil separator with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


51. INSTALL NOZZLE HOLDER GASKET RH

  1. A174978E02
    Press 4 new nozzle holder gaskets into the cylinder head cover RH.

    NOTICE:
    After installing the nozzle holder gasket, check that it does not protrude from the cylinder head cover.

    Text in Illustration 
    *1
    Nozzle Holder Gasket


52. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH

  1. A164158
    Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100135
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after the installation.

  1. Install a new gasket to the cylinder head cover.

    NOTICE:
    Remove any oil from the contact surface.

  1. A174972E01
    Temporarily install the cylinder head cover with the 18 bolts. Tighten the 18 bolts in the order shown in the illustration.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    After tightening the bolts, check that the bolts at step 11 and 20 are tightened to the specified torque.


53. INSTALL NOZZLE HOLDER SEAL RH
  1. Press 4 new holder seals into the cylinder head cover RH.


54. INSTALL CYLINDER HEAD COVER SILENCER LH (w/ Intercooler)
  1. Install the cylinder head cover silencer with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


55. INSTALL CYLINDER HEAD COVER SILENCER RH (w/ Intercooler)
  1. Install the cylinder head cover silencer with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


56. INSTALL VACUUM PUMP ASSEMBLY (w/ Intercooler)

  1. C160668
    Apply engine oil to 2 new O-rings.

  1. Install the 2 O-rings to the vacuum pump.

  1. C160890E01
    Install the vacuum pump so that the coupling teeth of the vacuum pump (labeled A) and the groove of the camshaft (labeled B) are aligned.

    NOTICE:
    Be careful not to damage the O-ring.

  1. C172878
    Install the vacuum pump with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Confirm that the vacuum pump is not at an angle, and that there is no clearance between the fitting surfaces.


57. INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
  1. Install the vacuum transmitting pipe with the 3 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. w/ Intercooler:
    Connect the 2 vacuum hoses.


58. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (w/ Intercooler)
  1. Install the vacuum switching valve with the bolt.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Connect the 2 vacuum hoses.


59. INSTALL GLOW PLUG ASSEMBLY
  1. Clean the glow plug and glow plug hole.

  1. A263013E02
    Apply adhesive to 3 or more thread roots in the area shown in the illustration.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    Text in Illustration 
    *a
    12 Thread Roots

  1. Using a 10 mm deep socket wrench, install the 8 glow plugs.

    Torque:
    12 N*m{ 125 kgf*cm , 9 ft.*lbf }


60. INSTALL NO. 1 GLOW PLUG CONNECTOR
  1. Install the 2 glow plug connectors by uniformly tightening the 8 nuts.

    Torque:
    2.2 N*m{ 22 kgf*cm , 19 in.*lbf }

  1. Install the 8 screw grommets.

  1. Connect the 2 wire harnesses with the 2 nuts and 2 screw grommets.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }


61. INSTALL WATER OUTLET PIPE
  1. Install 2 new gaskets and the water outlet pipe with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    The gasket claw should face toward the water outlet pipe.


62. INSTALL WATER OUTLET
  1. Install a new gasket and the water outlet with the 2 bolts, and then connect the water outlet to the No. 2 water hose joint.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


63. INSTALL NO. 2 INTERCOOLER SUPPORT BRACKET
  1. Install the No. 2 intercooler support bracket with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


64. INSTALL CLUTCH FLEXIBLE HOSE BRACKET (for Manual Transmission)

  1. A177336
    Install the clutch flexible hose bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


65. INSTALL STARTER HOSE BRACKET

  1. A177087
    Install the starter hose bracket with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


66. INSTALL STARTER ASSEMBLY
  1. Install the starter with the 2 bolts.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }

  1. A270275E01
    Connect the 2 starter hoses.
    Text in Illustration 
    *1
    Yellow Mark

  1. Attach the harness clamp and connect the wire harness.

  1. Connect the starter wire with the nut.

    Torque:
    20 N*m{ 200 kgf*cm , 14 ft.*lbf }

  1. Connect the starter connector.


67. INSTALL WATER PUMP ASSEMBLY

  1. A174821E01
    Temporarily install a new gasket and the water pump with the 9 bolts and 2 nuts.
    Bolt Length 
    Item
    Length
    Bolt A
    30 mm (1.18 in.)
    Bolt B
    80 mm (3.15 in.)

  1. A174821E02
    Uniformly tighten the 9 bolts and 2 nuts of the water pump in the order shown in the illustration.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    NOTICE:
    After installing all of the bolts and nuts, check that all of the bolts and nuts are tightened to the torque specification.


68. CONNECT INLET WATER HOSE

69. INSTALL NO. 2 IDLER PULLEY BRACKET (w/ Viscous Heater)

  1. A180290
    Temporarily install the No. 2 idler pulley bracket with the bolt.

  1. Temporarily install the 2 bolts to the No. 2 idler pulley bracket bolt hole.

  1. A180291E01
    Uniformly tighten the 3 bolts of the No. 2 idler pulley bracket in the order shown in the illustration.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


70. INSTALL NO. 2 IDLER PULLEY (w/ Viscous Heater)

  1. A177433
    Install the collar, No. 2 idler pulley and cover with the bolt.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


71. INSTALL FAN BRACKET SUB-ASSEMBLY

  1. A174820E01
    Install the fan bracket with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Bolt Length 
    Item
    Length
    Bolt A
    30 mm (1.18 in.)
    Bolt B
    80 mm (3.15 in.)


72. INSTALL TIMING GEAR COVER INSULATOR (w/ Intercooler)
  1. w/o Viscous Heater:
    Install the timing gear cover insulator with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. w/ Viscous Heater:
    Install the timing gear cover insulator.


73. INSTALL THERMOSTAT

  1. A161937E01
    Install a new gasket to the thermostat.

    NOTICE:
    When installing the gasket to the thermostat, be careful not to deform the gasket. Make sure that the groove of the gasket is properly installed onto the thermostat, as shown in the illustration.

  1. Insert the thermostat into the water pump with the jiggle valve facing straight upward.

    HINT:
    The jiggle valve may be set within 30° of either side of the prescribed position.


74. INSTALL WATER INLET

  1. A174816E01
    Install the water inlet with the 4 bolts.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. A174815
    Connect the No. 2 oil cooler hose to the clamp and water pump.


75. INSTALL NO. 1 IDLER PULLEY BRACKET (w/ Viscous Heater)

  1. A177432
    Install the No. 1 idler pulley bracket with the bolt.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


76. INSTALL VISCOUS HEATER ASSEMBLY WITH MAGNET CLUTCH (w/ Viscous Heater)

E154426
  1. Install the heater assembly with the 2 bolts.

    Torque:
    48.5 N*m{ 495 kgf*cm , 36 ft.*lbf }

  1. Connect the 2 heater hoses.

  1. Using pliers, grip the claws of the clips and slide the 2 clips.

  1. Connect the connector and attach the clamp.


77. INSTALL CRANKSHAFT POSITION SENSOR

A102906
  1. Apply a light coat of engine oil to the O-ring.

    NOTICE:
    When reusing the sensor, inspect the O-ring.
    If the O-ring has scratches or cuts, replace the sensor.

  1. A175725
    Install the sensor with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the sensor wire harness clamp.


78. INSTALL CAMSHAFT POSITION SENSOR

A124879
  1. Apply a light coat of engine oil to the O-ring.

    NOTICE:
    When reusing the sensor, inspect the O-ring.
    If the O-ring has scratches or cuts, replace the sensor.

  1. A163142
    Install the sensor with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the sensor connector.


79. INSTALL NO. 1 OIL PAN SUB-ASSEMBLY

NOTICE:
When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.


A177348
  1. Install the cylinder block oil hole gasket.

  1. Apply a light coat of engine oil to 3 new O-rings and set the 3 O-rings to the oil regulator and scavenging pump.

  1. A177350E01
    Apply seal packing to the No. 1 oil pan as shown in the illustration.

    Standard seal diameter:
    3.5 to 4.0 mm (0.134 to 0.157 in.)

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. For the 3 bolt holes labeled with arrows, apply the seal packing on the outer edges. For the other bolt holes, apply the seal packing on the inner edges.
    2. Make sure to apply a continuous bead of seal packing as shown in the illustration. If the bead breaks, overlap 3 mm (0.118 in.) of seal packing and continue the bead.
    3. Remove any oil and old seal packing from the contact surface.
    4. Install the No. 1 oil pan within 3 minutes and tighten the bolts and nuts within 15 minutes after applying seal packing.
    5. Do not start the engine for at least 2 hours after installing.

  1. A174874E01
    Install the No. 1 oil pan and oil reflector plate with the 20 bolts and 2 nuts.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    Bolt Length 
    Item
    Quantity
    Length
    Bolt A
    7
    70 mm (2.76 in.)
    Bolt B
    8
    20 mm (0.787 in.)
    Bolt C
    5
    30 mm (1.18 in.)


80. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Apply a light coat of engine oil to a new O-ring, and install it to the oil strainer.

  1. Install the oil strainer with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


81. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

NOTICE:
When the contact surfaces shown below are wet, wipe them with an oil-free cloth before applying seal packing.


A177349

  1. A177351E01
    Apply seal packing to the No. 2 oil pan as shown in the illustration.

    Standard seal diameter:
    5.0 to 6.0 mm (0.197 to 0.236 in.)

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. For the bolt and pin holes, make sure to apply seal packing to the inner sides.
    2. Make sure to apply a continuous bead of seal packing as shown in the illustration. If the bead breaks, overlap 3.0 mm (0.118 in.) of seal packing and continue the bead.
    3. Remove any oil from the contact surface.
    4. Install the No. 2 oil pan within 3 minutes and tighten the bolts and nuts within 10 minutes after applying seal packing.
    5. Do not start the engine for at least 2 hours after installing.

  1. Install the No. 2 oil pan with the 10 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


82. INSTALL ENGINE OIL LEVEL SENSOR
  1. Install a new gasket and the sensor with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


83. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY

  1. A177439E01
    Apply a light coat of engine oil to 2 new O-rings, and set them to the oil filter bracket.

  1. Install the oil filter bracket with the 3 bolts and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 wire harness clamps.


84. INSTALL OIL FILTER ELEMENT

  1. A106167E08
    Clean the inside of the oil filter cap, its threads and its O-ring groove.

  1. Apply a small amount of engine oil to a new O-ring and install it to the oil filter cap.

  1. Set a new oil filter element in the oil filter cap.

  1. Remove any dirt or foreign matter from the installation surface of the engine.

  1. Apply a small amount of engine oil to the O-ring again and temporarily install the oil filter cap by hand.

  1. A174854E02
    Using SST, tighten the oil filter cap.
    SST
    09228-06501  

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    1. Make sure that the oil filter is installed securely as shown in the illustration.
    2. Be careful that the O-ring does not get caught between any surrounding parts.

  1. A177436
    Install the No. 2 engine under cover seal to the No. 2 engine under cover with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


85. INSTALL TIMING GEAR COVER SPACER (w/ Intercooler)
  1. Install the timing gear cover spacer with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


86. INSTALL CRANKSHAFT PULLEY

NOTICE:
This procedure is intended for removal/installation of the crankshaft pulley only. Do not use this procedure for removal/installation of the flywheel or the drive plate and ring gear.

  1. A174866E02
    Align the crankshaft pulley and the crankshaft knock pin, and temporarily install the crankshaft pulley with the 3 bolts.
    Text in Illustration 
    *1
    Service Hole
    *2
    Protrusion

  1. Install the 2 bolts to the bolt holes of the crankshaft rear side.

  1. Using a bar, turn the crankshaft until the crankshaft pulley service hole is a little to the right of bottom dead center.

  1. Install a 14 mm x 1.5 pitch service bolt with a length of 70 mm or more to the crankshaft pulley service hole, and hold the crankshaft using the timing chain cover protrusion.

  1. A179714E01
    Uniformly tighten the 3 bolts in 2 passes in the order shown in the illustration.

    Torque:
    115 N*m{ 1168 kgf*cm , 84 ft.*lbf }

  1. Remove the service bolt.


87. CONNECT NO. 2 OIL COOLER HOSE
  1. Align the white paint marks on the oil cooler hose and oil filter bracket and connect the hose. Then connect the other side to the water pump and attach the oil cooler hose to the clamp.

    NOTICE:
    Make sure to maintain a space between the oil cooler hose and crankshaft pulley, and the oil cooler hose and V-ribbed belt idler pulley.


88. CONNECT NO. 1 OIL COOLER HOSE

89. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A177414E01
    Install the V-ribbed belt tensioner with the 5 bolts.

    Torque:
    for bolt A and C:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }
    for bolt B:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Bolt Length 
    Item
    Quantity
    Length
    Bolt A
    1
    116 mm (4.57 in.)
    Bolt B
    2
    40 mm (1.58 in.)
    Bolt C
    2
    95 mm (3.74 in.)

  1. Install the No. 1 idler pulley with the bolt.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the V-ribbed belt tensioner bracket with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


90. INSTALL STIFFENER INSULATOR RH (w/ Intercooler)
  1. Install the stiffener insulator RH with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


91. INSTALL COMPRESSOR BRACKET
  1. Install the compressor bracket with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


92. INSTALL NO. 2 CYLINDER BLOCK INSULATOR

93. INSTALL ENGINE MOUNTING BRACKET LH
  1. Install the engine mounting bracket LH with the 4 bolts.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }


94. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

  1. A177082E01
    Temporarily install a new gasket and No. 2 water by-pass pipe with the union bolt and 2 bolts.

  1. Tighten the union bolt and 2 bolts of the No. 2 water by-pass pipe in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


95. INSTALL NO. 3 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
  1. Install the No. 3 vacuum transmitting pipe with the 2 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. w/ Intercooler:
    Connect the vacuum hose.


96. INSTALL TURBOCHARGER WIRE
  1. Install the turbocharger wire with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Attach the 3 wire harness clamps.


97. INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET
  1. Install the No. 2 intake air connector bracket with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Attach the 2 wire clamps.


98. INSTALL NO. 1 CYLINDER BLOCK INSULATOR

99. INSTALL ENGINE MOUNTING BRACKET RH
  1. Install the engine mounting bracket RH with the 4 bolts.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }


100. INSTALL NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY (w/ Intercooler)
  1. Install the No. 4 vacuum transmitting pipe with the 2 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Connect the vacuum hose.


101. INSTALL NO. 1 WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Temporarily install a new gasket and the No. 1 water by-pass pipe with the union bolt and bolt.

  1. A177081E01
    Tighten the union bolt and bolt of the No. 1 water by-pass pipe in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


102. INSTALL AIR TUBE SUPPORT
  1. Install the air tube support with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


103. INSTALL NO. 1 INTAKE AIR CONNECTOR BRACKET
  1. Install the No. 1 intake air connector bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


104. INSTALL NO. 2 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD LH
  1. Install a new gasket to the No. 2 turbocharger.

  1. Install the exhaust manifold LH to the No. 2 turbocharger with 3 new nuts.

    Torque:
    69 N*m{ 704 kgf*cm , 51 ft.*lbf }

    HINT:
    The gasket claw should face toward the outside of the vehicle.

  1. w/ DPF:

    1. Install 2 new gaskets to the No. 2 exhaust manifold pipe.

      HINT:
      The gasket claws should face the No. 2 exhaust manifold pipe.

    2. A264032
      Temporarily install the No. 2 exhaust manifold pipe with the 4 bolts.

      HINT:
      Install the No. 2 exhaust manifold pipe so that it is oriented as shown in the illustration.

    3. Tighten the 4 bolts.

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install a new gasket to the cylinder head LH.

  1. Install the No. 2 turbocharger with exhaust manifold LH and 10 collars to the cylinder head LH with 10 new nuts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }


    A264035E01
    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

    HINT:
    Install the collars with the colored side facing the nuts.

  1. A177391
    Install a new gasket and the No. 2 inlet turbo oil pipe to the No. 1 oil pan with the union bolt.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

  1. Connect the 2 connectors to the turbocharger.


105. INSTALL NO. 2 VENTILATION TUBE SUB-ASSEMBLY

  1. Temporarily install a new gasket and the No. 2 ventilation tube with the union bolt and bolt.

    A264029E02

    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Clean and remove any oil in the area labeled 1 in the illustration.

  1. Connect the hose.


106. INSTALL NO. 2 TURBOCHARGER STAY
  1. Install the No. 2 turbocharger stay with the 2 bolts.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


107. CONNECT NO. 2 OUTLET TURBO OIL HOSE

HINT:
A267257E01
Align the white paint marks on the oil hose and pipe, and connect the hose.

Text in Illustration 
*1
Painted Mark

108. INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY

  1. A267251E01
    Temporarily install a new gasket and the No. 2 turbo water pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the water hose to the pipe.


109. INSTALL FRONT WATER BY-PASS JOINT
  1. Install a new gasket and the front water by-pass joint.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }


110. INSTALL NO. 3 TURBO WATER PIPE SUB-ASSEMBLY

  1. A177386E02
    Temporarily install a new gasket and the No. 3 turbo water pipe with the union bolt and 2 bolts.

  1. Tighten the union bolt and 2 bolts in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


111. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


112. CONNECT NO. 2 TURBO WATER HOSE

113. CONNECT BREATHER PLUG LH
  1. Install the breather plug LH.

  1. w/o DPF:
    Attach the clamp.

  1. Connect the hose.


114. CONNECT NO. 3 VENTILATION HOSE

115. INSTALL NO. 1 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD RH
  1. Install a new gasket to the No. 1 turbocharger.

  1. Install the exhaust manifold RH to the No. 1 turbocharger with 2 new nuts and the bolt.

    Torque:
    69 N*m{ 704 kgf*cm , 51 ft.*lbf }

  1. w/ DPF:

    1. Install 2 new gaskets to the No. 1 exhaust manifold pipe.

      HINT:
      The gasket claws should face the No. 1 exhaust manifold pipe.

    2. A264026
      Temporarily install the No. 1 exhaust manifold pipe with the 4 bolts.

      HINT:
      Install the No. 1 exhaust manifold pipe so that it is oriented as shown in the illustration.

    3. Tighten the 4 bolts.

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install a new gasket to the cylinder head RH.

  1. Install the No. 1 turbocharger with exhaust manifold RH to the cylinder head RH with the 10 collars and 10 new nuts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }


    A264036E01
    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

    HINT:
    Install the collars with the colored side facing the nuts.

  1. A177405
    Install a new gasket and the No. 1 inlet turbo oil pipe to the cylinder block with the union bolt.

    Torque:
    When "dry":
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    When "wet":
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

    NOTICE:
    1. The parts are "dry" when there is absolutely no engine oil on the union bolt and cylinder block bolt hole.
    2. The parts are "wet" when there is engine oil on the union bolt and cylinder block bolt hole.


116. INSTALL NO. 1 VENTILATION TUBE SUB-ASSEMBLY

  1. A264023E01
    Temporarily install a new gasket and the No. 1 ventilation tube with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 in.*lbf }

    NOTICE:
    Clean and remove any oil in the area labeled 1 in the illustration.

  1. Connect the hose.


117. INSTALL NO. 1 TURBOCHARGER STAY
  1. Temporarily install the No. 1 turbocharger stay with the 2 bolts.

  1. Tighten the 2 bolts.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


118. INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY

  1. A177401E02
    Install a new gasket and the No. 1 turbo water pipe with 2 new nuts and the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    Text in Illustration 
    *1
    New Nut

  1. Connect the water hose.


119. CONNECT NO. 1 OUTLET TURBO OIL HOSE

120. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


121. CONNECT NO. 2 TURBO WATER HOSE

122. CONNECT BREATHER PLUG RH
  1. Install the breather plug RH and attach the clamp.

  1. Connect the hose.


123. CONNECT NO. 2 VENTILATION HOSE

124. INSTALL GENERATOR ASSEMBLY

  1. A163035E02
    Temporarily install the generator with the 3 bolts and 2 nuts.

  1. Uniformly tighten the 3 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the generator cable and install the nut and bolt.

    Torque:
    for bolt:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }
    for nut (130A Type and 150A Type:):
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
    for nut (180A Type:):
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


125. INSTALL NO. 1 INTAKE AIR CONNECTOR PIPE
  1. Install the No. 1 intake air connector pipe with the bolt. Then tighten the hose clamp.

    Torque:
    for bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for hose clamp:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Connect the 4 connectors and attach the 5 wire harness clamps.


126. INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Apply a light coat of engine oil to a new O-ring, and install it to the No. 1 engine oil level dipstick guide.

  1. Install the No. 1 engine oil level dipstick guide with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


127. INSTALL ENGINE ASSEMBLY
  1. Install the engine assembly to the vehicle (Click here).


128. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Connect the cables to the negative (-) main battery and sub-battery terminals.

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →