2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL STARTER ASSEMBLY

  1. A175298
    Install the starter with the 2 bolts.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }

  1. A175297E01
    Connect the 2 starter hoses.

  1. A175296
    Attach the harness clamp and connect the wire harness.

  1. Connectl the starter wire with the nut.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the starter connector.


2. INSTALL FUEL COOLER ASSEMBLY
  1. Install the fuel cooler assembly (Click here).


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← REASSEMBLY (from Sep 2011)INSTALLATION (from Jan 2012) →