REMOVAL
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
 |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
| 2.
REMOVE FUEL COOLER ASSEMBLY |
 |
Remove the fuel cooler assembly (Click here).
| 3.
REMOVE STARTER ASSEMBLY |
 |
- Detach the harness clamp and disconnect the wire harness.
Disconnect the starter connector.
Remove the nut and disconnect the starter wire.
- Disconnect the 2 starter hoses.
- Remove the 2 bolts and starter.