2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

NOTICE:
  1. When replacing an injector (including interchanging injectors between cylinders) or common rail, replace the corresponding injection pipes with new ones.
  2. w/DPF
    When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines.


1. PRECAUTION

NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).


2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


3. REMOVE EGR VALVE ASSEMBLY (w/ DPF)
(Click here)

4. REMOVE FUEL COOLER ASSEMBLY (w/o DPF)
(Click here)

5. REMOVE EGR COOLER INSULATOR (w/ EGR System)

A174803

6. REMOVE STARTER ASSEMBLY

  1. A269804
    Detach the harness clamp and disconnect the wire harness.

  1. Disconnect the starter connector.

  1. Remove the nut and disconnect the starter wire.

  1. A269805
    Disconnect the 2 starter hoses.

  1. A269806
    Remove the 2 bolts and starter.

← REMOVAL (Sep 2011 – Dec 2011)DISASSEMBLY (from Sep 2011) →