2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. REMOVE INTAKE MANIFOLD
  1. Remove the intake manifold (Click here).


2. REMOVE WATER BY-PASS PIPE SUB-ASSEMBLY

  1. A179558
    Disconnect the connector.

  1. Disconnect the wire harness clamp from the water by-pass pipe.

  1. Disconnect the 2 vacuum switching valve hoses from the water by-pass pipe clamp.

  1. Remove the bolt.

  1. Pull out the water by-pass pipe.

  1. Remove the O-ring from the water by-pass pipe.


3. REMOVE NO. 2 AIR INJECTION SYSTEM HOSE

  1. A179559
    Remove the No. 2 air injection system hose from the rear water by-pass joint and air switching valve.


4. REMOVE AIR PUMP WITH BRACKET AND AIR SWITCHING VALVE

  1. A179560
    Disconnect the air switching valve connector.

  1. Disconnect the air pressure sensor connector.

  1. Remove the 2 bolts, 2 nuts and air pump with bracket.


5. REMOVE AIR SWITCHING VALVE ASSEMBLY

  1. A179562
    Disconnect the air pressure sensor connector.

  1. Disconnect the air switching valve connector.

  1. Remove the vacuum hose from the air pressure sensor and air switching valve.

  1. Remove the 2 bolts and air pressure sensor from the air switching valve.

  1. A179563
    Remove the 2 bolts and air switching valve from the air pump bracket.

  1. Remove the air switching valve from the No. 1 air injection system hose.


6. REMOVE NO. 1 AIR INJECTION SYSTEM HOSE
  1. Remove the hose from the air pump assembly.


7. REMOVE AIR PUMP ASSEMBLY
  1. Remove the air hose.

  1. A159763E01
    Remove the 3 bolts, 3 collars, 3 insulators and air pump.

← COMPONENTS (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →