2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL INJECTOR DRIVER

NOTICE:
Be careful not to drop or strike the injector driver.

  1. w/ DPF:
    Install the No. 2 injector driver to the No. 2 injector driver bracket with the 4 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. w/o DPF:
    Install the No. 2 injector driver and injector driver bracket to the No. 2 injector driver bracket with the 4 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. w/ DPF:
    Install the No. 1 injector driver to the No. 1 injector driver bracket with the 4 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. w/o DPF:
    Install the No. 1 injector driver and injector driver bracket to the No. 1 injector driver bracket with the 4 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Install the No. 2 injector driver bracket to the No. 1 injector driver bracket with the 2 bolts.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. w/ DPF:

    1. Install the injector driver assembly with the 3 bolts.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    2. Install the ground wire to the No. 2 injector driver bracket with the bolt.

      Torque:
      8.4 N*m{ 85 kgf*cm , 74 in.*lbf }

    3. Connect the 7 injector driver connectors and attach the 2 wire harness clamps.

  1. w/o DPF:

    1. Install the injector driver assembly with the 3 bolts.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    2. Attach the fuel hose clamp and wire harness clamp.

    3. Connect the 4 injector driver connectors.

    4. Install the ground wire to the No. 1 injector driver bracket with the bolt.

      Torque:
      8.4 N*m{ 85 kgf*cm , 74 in.*lbf }


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Connect the cables to the negative (-) main battery and sub-battery terminals.

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →