2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL FUEL SENDER GAUGE ASSEMBLY
  1. Install a new gasket to the sender gauge.

  1. Install the sender gauge with the 5 screws.

    Torque:
    1.5 N*m{ 15 kgf*cm , 13 in.*lbf }

    NOTICE:
    Be careful not to bend the arm of the fuel sender gauge.

  1. Connect the sender gauge connector.


2. INSTALL REAR FLOOR SERVICE HOLE COVER
  1. Install the service hole cover with new butyl tape.


3. INSTALL REAR NO. 7 AIR DUCT (w/ Rear Air Conditioning System)

  1. A176392E01
    Attach the 4 clips to install the air duct.

    HINT:
    Attach the clips in the order shown in the illustration.


4. INSTALL REAR FLOOR MAT ASSEMBLY
  1. Attach the 5 clips to install the floor mat.


5. REMOVE FRONT QUARTER TRIM PANEL ASSEMBLY LH
  1. w/ Sliding Roof (Click here)
  2. w/o Sliding Roof (Click here)

6. REMOVE FRONT QUARTER TRIM PANEL ASSEMBLY RH
  1. w/ Sliding Roof (Click here)
  2. w/o Sliding Roof (Click here)

7. REMOVE REAR NO. 2 SEAT ASSEMBLY
  1. for Face to Face Seat Type (Click here)
  2. except Face to Face Seat Type (Click here)

8. REMOVE REAR NO. 1 SEAT ASSEMBLY RH (for 60/40 Split Seat Type 40 Side)
(Click here)

9. REMOVE REAR NO. 1 SEAT ASSEMBLY LH (for 60/40 Split Seat Type 60 Side)
(Click here)

10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSPECTION (from Jan 2012)PRECAUTION (Sep 2011 – Dec 2011) →