INSTALLATION
Removal / installation · Vehicles built from Jan 2012
| 1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration *1
Paint Mark
*2
Rib
*a
Top
*b
LH Side
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 2 emission control valve set connector.
| 2. INSTALL NO. 2 AIR TUBE |
Install 2 new gaskets.

Text in Illustration *1
Claw
*2
No. 2 Air Tube
- NOTICE:
- Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.
Install the No. 2 air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
| 3. INSTALL PURGE VSV |
Install the purge VSV (Click here).