Home › Engine / Hybrid System › 1VD-FTV (ENGINE CONTROL) › ECM › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052773 1VD-FTV ENGINE CONTROL _0254995 ECM A

1VD-FTV ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 1.INSTALL GASKET

a.

Clean the ECM seal surface with non-residue solvent.


b.

Install a new gasket to the ECM.


Hide 89661 2.INSTALL ECM

a.
A155993

Install the ECM with the 4 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:
·

Make sure the gasket is not folded or caught on any area on the surrounding part.

·

Make sure there is no foreign matter caught between the gasket and surrounding part.

·

Do not damage the gasket.




b.
A160064

Connect the 2 ECM connectors and push each lock lever down to lock the ECM connectors.

NOTICE:
·

Be careful not to allow dirt, water, or other foreign matter to adhere to the connecting parts when connecting the connectors.

·

Do not twist the wire harness when connecting the ECM connectors.

·

Make sure that the lock lever is raised 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.

·

Make sure that the levers are securely locked.




Hide 82664A 3.CONNECT CONNECTOR HOLDER BLOCK

a.
A183089E03
0.104,0.177 0.781,0.427 0.677,0.25 10 true for LHD: 0.115,2.396 0.792,2.594 0.677,0.198 10 true for RHD:

Connect the connector holder block with the 3 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).