Home › Engine / Hybrid System › 1GR-FE (ENGINE MECHANICAL) › CYLINDER HEAD GASKET › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052778 1GR-FE ENGINE MECHANICAL _0255055 CYLINDER HEAD GASKET A

1GR-FE ENGINE MECHANICAL  CYLINDER HEAD GASKET  INSTALLATION  


PROCEDURE

Hide 11115 3.INSTALL CYLINDER HEAD GASKET

a.

Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head or cylinder block.


b.
U147577E04
2.583,0.521 2.458,0.521 2.458,0.521 2.323,0.708 false 2.646,1.49 2.521,1.49 2.521,1.49 2.344,1.188 false 2.917,1.26 2.781,1.26 2.781,1.26 2.688,0.99 false 0.135,0.25 0.281,0.427 0.146,0.177 10 false A 2.021,1.49 2.167,1.667 0.146,0.177 10 false B 0.125,1.802 0.271,1.979 0.146,0.177 10 false A 2.625,0.427 2.844,0.604 0.219,0.177 10 false *1 2.948,1.156 3.167,1.333 0.219,0.177 10 false *2 2.104,1.917 2.323,2.094 0.219,0.177 10 false *1 2.667,1.427 2.885,1.604 0.219,0.177 10 false *1

Apply seal packing to a new cylinder head gasket as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent


Standard seal diameter:

2.5 to 3.0 mm (0.0984 to 0.118 in.)


Seal Packing Application Range
A 10 to 15 mm (0.394 to 0.591 in.)
B 1.25 to 1.5 mm (0.0492 to 0.0591 in.)

Text in Illustration
*1 Seal Packing
*2 Gasket

NOTICE:
·

Remove any oil from the contact surface.

·

Install the cylinder head gasket within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

·

Do not add engine oil within 2 hours of installation.




c.
A221095E01
1.995,0.055 2.172,0.237 0.177,0.181 10 *1 1.96,0.153 1.812,0.153 1.812,0.153 1.602,0.337 false

Place the cylinder head gasket on the cylinder block surface with the front face of the Lot No. stamp upward.

Text in Illustration
*1 Lot No.
V100135

Engine Front

NOTICE:

Make sure that the gasket is installed facing the proper direction.



Hide 11101 4.INSTALL CYLINDER HEAD SUB-ASSEMBLY

a.

Place the cylinder head on the cylinder block.

NOTICE:
·

Gently place the cylinder head in order not to damage the gasket with the bottom part of the head.

·

Make sure that no oil is on the mounting surface of the cylinder head.



HINT:

The cylinder head bolts are tightened in 3 progressive steps.



b.

Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.


c.

Step 1:

i.
A221092E09
1.219,1.865 1.375,2.052 0.156,0.188 10 true 3 0.51,1.875 0.698,2.063 0.188,0.188 10 true 5 0.51,0.042 0.698,0.219 0.188,0.177 10 true 7 1.24,0.031 1.438,0.24 0.198,0.208 10 true 2 1.958,1.865 2.125,2.042 0.167,0.177 10 true 1 2.677,1.844 2.854,2.031 0.177,0.188 10 true 8 2.677,0.042 2.854,0.208 0.177,0.167 10 true 6 1.969,0.042 2.104,0.229 0.135,0.188 10 true 4

Using a 10 mm bi-hexagon wrench, install and uniformly tighten the 8 cylinder head bolts with the plate washers in several steps in the sequence shown in the illustration.

Torque:
36 N*m (367 kgf*cm, 27 ft.*lbf)



d.

Step 2:

i.

Mark the front side of each cylinder head bolt head with paint.


ii.

Tighten the cylinder head bolts another 90°.



e.

Step 3:

i.

Tighten the cylinder head bolts an additional 90°.


ii.

Check that the paint marks are now at a 180° angle to the front.

NOTICE:

Thoroughly wipe clean any seal packing.




Hide 11116 5.INSTALL NO. 2 CYLINDER HEAD GASKET

a.

Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head or cylinder block.


b.
U147578E04
2.688,0.542 2.563,0.542 2.563,0.542 2.427,0.74 false 2.719,1.542 2.594,1.542 2.594,1.542 2.417,1.24 false 3,1.25 2.865,1.25 2.865,1.25 2.771,0.99 false 0.125,0.219 0.271,0.396 0.146,0.177 10 false A 2.115,1.49 2.26,1.667 0.146,0.177 10 false B 0.135,1.333 0.281,1.51 0.146,0.177 10 false A 2.708,0.396 2.927,0.573 0.219,0.177 10 false *1 3.031,1.115 3.25,1.292 0.219,0.177 10 false *2 1.865,1.885 2.083,2.063 0.219,0.177 10 false *1 2.75,1.417 2.969,1.594 0.219,0.177 10 false *1

Apply seal packing to a new cylinder head gasket as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent


Standard seal diameter:

2.5 to 3.0 mm (0.0984 to 0.118 in.)


Seal Packing Application Range
A 10 to 15 mm (0.394 to 0.591 in.)
B 1.25 to 1.5 mm (0.0492 to 0.0591 in.)

Text in Illustration
*1 Seal Packing
*2 Gasket

NOTICE:
·

Remove any oil from the contact surface.

·

Install the cylinder head gasket within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

·

Do not add engine oil within 2 hours of installation.




c.
A221096E01
1.456,1.881 1.634,2.063 0.177,0.182 10 *1 1.659,1.969 1.831,1.969 1.831,1.969 2,1.768 false

Place the cylinder head gasket on the cylinder block surface with the front face of the Lot No. stamp upward.

Text in Illustration
*1 Lot No.
V100135

Engine Front

NOTICE:

Make sure that the gasket is installed facing the proper direction.



Hide 11102 6.INSTALL CYLINDER HEAD LH

a.

Place the cylinder head on the cylinder block.

NOTICE:
·

Gently place the cylinder head in order not to damage the gasket with the bottom part of the head.

·

Make sure that no oil is on the mounting surface of the cylinder head.



HINT:

The cylinder head bolts are tightened in 3 progressive steps.



b.

Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.


c.

Step 1:

i.
A221094E08
1.583,0.083 1.76,0.26 0.177,0.177 10 true 1 0.917,0.083 1.094,0.26 0.177,0.177 10 true 8 0.917,1.854 1.104,2.052 0.188,0.198 10 true 6 1.594,1.823 1.781,2.01 0.188,0.188 10 true 4 2.281,0.063 2.458,0.229 0.177,0.167 10 true 3 2.958,0.063 3.167,0.24 0.208,0.177 10 true 5 2.958,1.823 3.135,2 0.177,0.177 10 true 7 2.281,1.833 2.469,2.021 0.188,0.188 10 true 2

Using a 10 mm bi-hexagon wrench, install and uniformly tighten the 8 cylinder head bolts with the plate washers in several steps in the sequence shown in the illustration.

Torque:
36 N*m (367 kgf*cm, 27 ft.*lbf)



d.

Step 2:

i.

Mark the front side of each cylinder head bolt head with paint.


ii.

Tighten the cylinder head bolts another 90°.



e.

Step 3:

i.

Tighten the cylinder head bolts an additional 90°.


ii.

Check that the paint marks are now at a 180° angle to the front.



f.
A221093E02
0.04,1.049 0.174,1.204 0.133,0.156 10 2 0.038,0.44 0.171,0.596 0.133,0.156 10 1

Install the 2 bolts in the order shown in the illustration.

Torque:
30 N*m (306 kgf*cm, 22 ft.*lbf)

NOTICE:

Thoroughly wipe clean any seal packing.



Hide 13801 10.INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY

Hide 13560A 15.INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY

Hide 16.INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 2)

Hide 13550 17.INSTALL NO. 2 CHAIN TENSIONER ASSEMBLY

Hide 18.INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 1)

Hide 13561 19.INSTALL NO. 1 CHAIN VIBRATION DAMPER

Hide 13562 20.INSTALL NO. 2 CHAIN VIBRATION DAMPER

Hide 13540 25.INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

Hide 11302 27.INSTALL TIMING CHAIN COVER SUB-ASSEMBLY