25710
1.INSTALL AIR SWITCHING VALVE ASSEMBLY
Install a new gasket and the air switching valve with the 3 bolts.
| *1 | No. 4 Air Tube |
| *2 | Claw |
| *3 | Air Switching Valve |
Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.
Install the 2 bolts.
Connect the wire harness clamp bracket with the bolt.
17342
2.CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
Connect the No. 2 air injection system hose.
| *1 | Protrusion |
| *2 | Paint Mark |
Make sure the direction of the hose clamp is as shown in the illustration.
Connect the connector.
11209
3.INSTALL V-BANK COVER SUB-ASSEMBLY