w/ DPF:
When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (See page Engine / Hybrid System>1VD-FTV (EMISSION CONTROL)>EMISSION CONTROL SYSTEM>ON-VEHICLE INSPECTION).
15408G
1.INSTALL NO. 2 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 2)
Temporarily install a new gasket and the No. 2 inlet turbo oil pipe with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
15482
2.INSTALL NO. 2 TURBO OIL PIPE (for Bank 2)
Install a new gasket and the No. 2 turbo oil pipe with the 2 bolts.
The gasket claws should face the pipe.
17286
3.INSTALL NO. 2 INLET COMPRESSOR ELBOW (for Bank 2)
Install a new gasket and the No. 2 inlet compressor elbow with the 2 bolts.
Install the No. 2 inlet compressor elbow with the "L" mark facing toward the outside of the vehicle.
17208
4.INSTALL NO. 2 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD LH (for Bank 2)
Install a new gasket to the No. 2 turbocharger.
Install the exhaust manifold LH to the No. 2 turbocharger with 3 new nuts.
The gasket claw should face toward the outside of the vehicle.
w/ DPF:
Install 2 new gaskets to the No. 2 exhaust manifold pipe.
The gasket claws should face the No. 2 exhaust manifold pipe.
Temporarily install the No. 2 exhaust manifold pipe with the 4 bolts.
Install the No. 2 exhaust manifold pipe so that it is oriented as shown in the illustration.
Tighten the 4 bolts.
Install a new gasket to the cylinder head LH.
Install the No. 2 turbocharger with exhaust manifold LH and 10 collars to the cylinder head LH with 10 new nuts.
| *A | w/ DPF | *B | w/o DPF |
Install the collars with the colored side facing the nuts.
Install a new gasket and the No. 2 inlet turbo oil pipe to the No. 1 oil pan with the union bolt.
Connect the 2 connectors to the turbocharger.
12202
5.INSTALL NO. 2 VENTILATION TUBE SUB-ASSEMBLY (for Bank 2)
Temporarily install a new gasket and the No. 2 ventilation tube with the union bolt and bolt.
| *A | w/ DPF | *B | w/o DPF |
Tighten the union bolt and bolt in the order shown in the illustration.
Clean and remove any oil in the area labeled 1 in the illustration.
Connect the hose.
17297
6.INSTALL NO. 2 TURBOCHARGER STAY (for Bank 2)
Install the No. 2 turbocharger stay with the 2 bolts.
15492
7.INSTALL NO. 2 OUTLET TURBO OIL HOSE (for Bank 2)
Align the white paint marks on the oil hose and pipe, and connect the hose.
| *1 | Painted Mark |
16028
8.INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)
Temporarily install a new gasket and the No. 2 turbo water pipe with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
Connect the water hose to the pipe.
16355
9.INSTALL FRONT WATER BY-PASS JOINT (for Bank 2)
Install a new gasket and the front water by-pass joint.
16029
10.INSTALL NO. 3 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)
Temporarily install a new gasket and the No. 3 turbo water pipe with the union bolt and 2 bolts.
Tighten the union bolt and 2 bolts in the order shown in the illustration.
17168
11.INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 2)
Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
16287
12.INSTALL NO. 2 TURBO WATER HOSE (for Bank 2)
13.INSTALL BREATHER PLUG LH (for Bank 2)
Install the breather plug LH.
w/o DPF:
Attach the clamp.
Connect the hose.
12263
14.INSTALL NO. 3 VENTILATION HOSE (for Bank 2)
15407
15.INSTALL NO. 1 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 1)
Temporarily install a new gasket and the No. 1 inlet turbo oil pipe with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
15481
16.INSTALL NO. 1 TURBO OIL PIPE (for Bank 1)
Install a new gasket and the No. 1 turbo oil pipe with the 2 bolts.
17274
17.INSTALL NO. 1 INLET COMPRESSOR ELBOW (for Bank 1)
Install a new gasket and the No. 1 inlet compressor elbow with the 2 bolts.
Install the No. 1 inlet compressor elbow with the "R" mark facing toward the outside of the vehicle.
17201
18.INSTALL NO. 1 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD RH (for Bank 1)
Install a new gasket to the No. 1 turbocharger.
Install the exhaust manifold RH to the No. 1 turbocharger with 2 new nuts and the bolt.
w/ DPF:
Install 2 new gaskets to the No. 1 exhaust manifold pipe.
The gasket claws should face the No. 1 exhaust manifold pipe.
Temporarily install the No. 1 exhaust manifold pipe with the 4 bolts.
Install the No. 1 exhaust manifold pipe so that it is oriented as shown in the illustration.
Tighten the 4 bolts.
Install a new gasket to the cylinder head RH.
Install the No. 1 turbocharger with exhaust manifold RH to the cylinder head RH with the 10 collars and 10 new nuts.
| *A | w/ DPF | *B | w/o DPF |
Install the collars with the colored side facing the nuts.
Install a new gasket and the No. 1 inlet turbo oil pipe to the cylinder block with the union bolt.
The parts are "dry" when there is absolutely no engine oil on the union bolt and cylinder block bolt hole.
The parts are "wet" when there is engine oil on the union bolt and cylinder block bolt hole.
12201
19.INSTALL NO. 1 VENTILATION TUBE SUB-ASSEMBLY (for Bank 1)
Temporarily install a new gasket and the No. 1 ventilation tube with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
Clean and remove any oil in the area labeled 1 in the illustration.
Connect the hose.
17293
20.INSTALL NO. 1 TURBOCHARGER STAY (for Bank 1)
Temporarily install the No. 1 turbocharger stay with the 2 bolts.
Tighten the 2 bolts.
16027
21.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 1)
Install a new gasket and the No. 1 turbo water pipe with 2 new nuts and the 3 bolts.
| *1 | New Nut |
Connect the water hose.
15474A
22.CONNECT NO. 1 OUTLET TURBO OIL HOSE (for Bank 1)
17167
23.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 1)
Install the No. 1 exhaust manifold heat insulator with the 3 bolts.
16285
24.INSTALL NO. 2 TURBO WATER HOSE (for Bank 1)
25.INSTALL BREATHER PLUG RH (for Bank 1)
Install the breather plug RH and attach the clamp.
Connect the hose.
12262
26.INSTALL NO. 2 VENTILATION HOSE (for Bank 1)
17875
27.INSTALL NO. 1 INTAKE AIR CONNECTOR PIPE (for Bank 1)
Install the No. 1 intake air connector pipe with the bolt. Then tighten the hose clamp.
Connect the 4 connectors and attach the 5 wire harness clamps.
11452
28.INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE (for Bank 1)
Apply a light coat of engine oil to a new O-ring and install it to the No. 1 engine oil level dipstick guide.
Install the No. 1 engine oil level dipstick guide with the 2 bolts.
29.INSTALL ENGINE ASSEMBLY
30.INSPECT FOR OIL LEAK
31.INSPECT FOR COOLANT LEAK
32.CHECK ENGINE OIL LEVEL
33.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
Connect the cables to negative (-) main battery and sub-battery terminals.
34.PERFORM TURBOCHARGER INITIALIZATION