Home › Steering › POWER ASSIST SYSTEMS › POWER STEERING SYSTEM
RM37H0E _55 Steering _097126 POWER ASSIST SYSTEMS _0454879 POWER STEERING SYSTEM C

POWER ASSIST SYSTEMS  POWER STEERING SYSTEM  C155A16  Power Steering Motor "A" Supply Voltage Circuit Voltage Below Threshold  C155A17  Power Steering Motor "A" Supply Voltage Circuit Voltage Above Threshold  


DESCRIPTION

DTC No. Detection Item DTC Detection Condition Trouble Area Warning Indicate DTC Output from Priority
C155A16 Power Steering Motor "A" Supply Voltage Circuit Voltage Below Threshold PIG voltage of system 1 is at or lower than the specified value
·

Harness or connector

·

Rack and pinion power steering gear assembly


EPS warning light: Comes on EMPS A
C155A17 Power Steering Motor "A" Supply Voltage Circuit Voltage Above Threshold PIG voltage of system 1 is at or higher than the specified value
·

Harness or connector

·

Rack and pinion power steering gear assembly


EPS warning light: Comes on EMPS A

WIRING DIAGRAM

C441858E09
3.938,2.698 7.083,3 3.146,0.302 10 false Rack and Pinion Power Steering Gear Assembly 1.708,0.542 2.583,0.781 0.875,0.24 10 false EPS NO.1 5.667,0.375 6,0.573 0.333,0.198 10 false PIG 5.677,0.875 6.156,1.063 0.479,0.188 10 false PGND 4.833,0.292 5.375,0.552 0.542,0.26 10 false 8 4.844,0.771 5.385,1.031 0.542,0.26 10 false 7 3.927,2.052 4.906,2.25 0.979,0.198 10 false a1 (*1) 5.563,1.271 6.542,1.677 0.979,0.406 10 false Power Steering ECU 3.927,2.375 4.906,2.573 0.979,0.198 10 false A79 (*2) 1.01,2.115 2.698,2.313 1.688,0.198 10 false *1: for LHD 1.021,2.563 2.708,2.76 1.688,0.198 10 false *2: for RHD

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

When replacing the rack and pinion power steering gear assembly, perform Power Steering ECU Initial Setting.

Click hereSteering>POWER ASSIST SYSTEMS>POWER STEERING SYSTEM>UTILITY



PROCEDURE

1.CHECK VEHICLE TYPE
Result:
Result Proceed to
for LHD A
for RHD B



A

2.CHECK HARNESS AND CONNECTOR (PGND)

B

4.CHECK HARNESS AND CONNECTOR (PGND)
2.CHECK HARNESS AND CONNECTOR (PGND)

Pre-procedure1

a.

Disconnect the a1 rack and pinion power steering gear assembly connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(a1)Location & Routing

Click Connector(a1)Engine Compartment>ECU Wire Sub-Assembly>Power Steering ECU with Motor Assembly (Rack & Pinion Power Steering Gear Assembly)

a1-7 (PGND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

a.

None



OK

3.CHECK HARNESS AND CONNECTOR (PIG POWER SOURCE)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

3.CHECK HARNESS AND CONNECTOR (PIG POWER SOURCE)

Pre-procedure1

a.

Disconnect the a1 rack and pinion power steering gear assembly connector.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(a1)Location & Routing

Click Connector(a1)Engine Compartment>ECU Wire Sub-Assembly>Power Steering ECU with Motor Assembly (Rack & Pinion Power Steering Gear Assembly)

a1-8 (PIG) - Body ground Always 9 to 16 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

None



OK

REPLACE RACK AND PINION POWER STEERING GEAR ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

4.CHECK HARNESS AND CONNECTOR (PGND)

Pre-procedure1

a.

Disconnect the A79 rack and pinion power steering gear assembly connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A79)Location & Routing

Click Connector(A79)Engine Compartment>Front Compartment Main Wire / No. 3 Front Compartment Wire / No. 4 Front Compartment Wire>Power Steering ECU with Motor Assembly (Rack & Pinion Power Steering Gear Assembly)

A79-7 (PGND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

a.

None



OK

5.CHECK HARNESS AND CONNECTOR (PIG POWER SOURCE)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.CHECK HARNESS AND CONNECTOR (PIG POWER SOURCE)

Pre-procedure1

a.

Disconnect the A79 rack and pinion power steering gear assembly connector.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A79)Location & Routing

Click Connector(A79)Engine Compartment>Front Compartment Main Wire / No. 3 Front Compartment Wire / No. 4 Front Compartment Wire>Power Steering ECU with Motor Assembly (Rack & Pinion Power Steering Gear Assembly)

A79-8 (PIG) - Body ground Always 9 to 16 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

None



OK

REPLACE RACK AND PINION POWER STEERING GEAR ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR