The No. 1 skid control ECU (brake booster with master cylinder assembly) detects the brake operating conditions through a signal transmitted by the stop light switch assembly.
The No. 1 skid control ECU (brake booster with master cylinder assembly) incorporates a circuit to detect an open circuit. This DTC is output when an open circuit is detected in the stop light signal input line.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from | Priority | Note |
|---|---|---|---|---|---|---|
| P057100 | Brake Switch "A" | An open in the stop light switch circuit continues for 10 seconds or more. | ·
Wire harness and connector ·
Stop light switch assembly ·
No. 1 skid control ECU (brake booster with master cylinder assembly) ·
No. 2 semiconductor power integration ECU ·
STP circuit |
Brake Booster | A | Output ECU: No. 1 skid control ECU (brake booster with master cylinder assembly) |
Inspect the fuses for circuits related to this system before performing the following procedure.
After replacing the No. 1 skid control ECU (brake booster with master cylinder assembly), perform "Calibration".
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>UTILITY
Check that the stop lights come on when the brake pedal is depressed.
| Result | Proceed to |
|---|---|
| All stop lights illuminate when the brake pedal is depressed and turn off when the brake pedal is released. | A |
| All stop lights do not illuminate when the brake pedal is depressed. | B |
| One or more stop lights illuminate when the brake pedal is depressed but remain on when the brake pedal is released. | C |
A
B
C
Check the value of Stop Light SW when the brake pedal is depressed.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| Stop Light SW | Stop light switch assembly (STP terminal input) | OFF / ON | OFF: Brake pedal released
ON: Brake pedal depressed |
|
| Tester Display |
|---|
| Stop Light SW |
| Result | Proceed to |
|---|---|
| The value of Stop Light SW is ON | A |
| None of the above conditions are met | B |
A
B
Pre-procedure1
Turn the ignition switch off.
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Pre-procedure2
Turn the ignition switch to ON.
Procedure2
| *a | Component with harness connected
(Stop Light Switch Assembly) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A3)Location & Routingewd_type=routing;type=c;code=A3 Click Connector(A3)Instrument Panel>Front Compartment Main Wire>Stop Light Switch Assemblyewd_type=component;type=c;code=A3;pinno=2 |
||
| A3-2 (L) - Body ground | ·
Ignition switch ON ·
The headlights are on ·
The blower motor switch is in the HI position ·
The rear window defogger is turned on ·
Stop light switch assembly off (Brake pedal released) |
Below 1.5 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Pre-procedure1
None
Procedure1
Clear the DTCs.
| Proceed to |
|---|
| NEXT |
Post-procedure1
Turn the ignition switch off.
NEXT
Pre-procedure1
Based on the Freeze Frame Data and interview with the customer, attempt to reproduce the conditions when the malfunction occurred.
Procedure1
Check if the same DTC is output.
| Result | Proceed to |
|---|---|
| P057100 is not output | A |
| P057100 is output | B |
Post-procedure1
None
A
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
B
for LHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for LHD)>REMOVAL
for RHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for RHD)>REMOVAL
Pre-procedure1
Turn the ignition switch off.
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Pre-procedure2
Disconnect the A3 stop light switch assembly connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A3)Location & Routingewd_type=routing;type=c;code=A3 Click Connector(A3)Instrument Panel>Front Compartment Main Wire>Stop Light Switch Assemblyewd_type=component;type=c;code=A3;pinno=2 |
||
| A3-2 (L) - Body ground | Stop light switch assembly off
(Brake pedal released) |
Below 1.5 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Pre-procedure1
Disconnect the A5 No. 1 skid control ECU (brake booster with master cylinder assembly) connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A3)Location & Routingewd_type=routing;type=c;code=A3 Click Connector(A3)Instrument Panel>Front Compartment Main Wire>Stop Light Switch Assemblyewd_type=component;type=c;code=A3;pinno=2 |
||
| A3-2 (L) - Body ground | Stop light switch assembly off
(Brake pedal released) |
Below 1.5 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
for LHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for LHD)>REMOVAL
for RHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for RHD)>REMOVAL
NG
Pre-procedure1
Turn the ignition switch off.
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Pre-procedure2
Disconnect the A5 No. 1 skid control ECU (brake booster with master cylinder assembly) connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A5)Location & Routingewd_type=routing;type=c;code=A5 |
||
| A5-37 (STP) - Body ground | Stop light switch assembly on
(Brake pedal depressed) |
11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
for LHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for LHD)>REMOVAL
for RHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for RHD)>REMOVAL
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Pre-procedure1
Disconnect the G102 No. 3 semiconductor power integration ECU connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A3)Location & Routingewd_type=routing;type=c;code=A3 Click Connector(A3)Instrument Panel>Front Compartment Main Wire>Stop Light Switch Assemblyewd_type=component;type=c;code=A3;pinno=2 |
||
| A3-2 (L) - Body ground | Stop light switch assembly off
(Brake pedal released) |
Below 1.5 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Check that there is no short to +B in the STP circuit (wire harnesses, connectors, ECUs and stop lights).
No short to +B.
| Proceed to |
|---|
| OK |
| NG |
OK
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
NG
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
| *a | Component with harness connected
(No. 2 Semiconductor Power Integration ECU) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G102)Location & Routingewd_type=routing;type=c;code=G102 Click Connector(G102)Body>Floor Wire / No. 3 Floor Wire>No. 2 Semiconductor Power Integration ECUewd_type=component;type=c;code=G102;pinno=10 |
||
| G102-10 (STP) - Body ground | Stop light switch assembly on
(Brake pedal depressed) |
11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Check that there is no open in the wire harnesses and connectors from terminal L of the stop light switch assembly to the No. 2 semiconductor power integration ECU.
No open.
| Proceed to |
|---|
| OK |
| NG |
OK
for LHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for LHD)>REMOVAL
for RHD: Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE BOOSTER (for RHD)>REMOVAL
NG