Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › BATTERY BLOWER › 2011.12–2014.12
RM2170E _51 Engine / Hybrid System _057004 HYBRID / BATTERY CONTROL _0277937 BATTERY BLOWER A

HYBRID / BATTERY CONTROL  BATTERY BLOWER  INSTALLATION  


PROCEDURE

Hide G9230 1.INSTALL BATTERY COOLING BLOWER ASSEMBLY

a.

Install the battery cooling blower assembly with the nut and 2 bolts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)

NOTICE:
·

Be sure not to touch the fan part of the battery cooling blower assembly.

·

Do not lift the battery cooling blower assembly using the wire harness.




b.

Connect the clamp and connector.