Home › Engine / Hybrid System › 2ZR-FXE (ENGINE CONTROL) › ECM › 2012.03–2012.10
RM2070E _51 Engine / Hybrid System _061905 2ZR-FXE ENGINE CONTROL _0301563 ECM A

2ZR-FXE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89661 1.INSTALL ECM

a.

Install the ECM with the 2 bolts.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


b.

Install the 2 wire harness clamps.


c.

Connect the 2 ECM connectors.

i.
A216692

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

·

Make sure that the 2 levers are securely locked.




ii.

Install the 2 wire harness clamps.



d.

Install the No. 2 engine room wire with the bolt.

Torque:
8.3 N*m (85 kgf*cm, 73 in.*lbf)


e.
A214454

Slide the side cover down and engage the 2 claws to install it.


f.
A214453

Slide the engine room wire harness down and engage the 2 claws to install it.


g.

Connect the 3 wire harness connectors.


h.

Install the No. 1 relay block cover.


Hide G92A0A 2.INSTALL INVERTER RESERVE TANK ASSEMBLY

a.

Install the inverter reserve tank assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide G9200 3.INSTALL INVERTER WITH CONVERTER ASSEMBLY

Hide 4.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

Hide 10.PERFORM INITIALIZATION

NOTICE:
·

Perform Initialization when replacing the ECM (See page Engine / Hybrid System>2ZR-FXE (ENGINE CONTROL)>THROTTLE BODY>INSTALLATION).

·

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).