SFI SYSTEM (w/ EGR System) > Fuel Pump Control Circuit |


| 1.PERFORM ACTIVE TEST USING INTELLIGENT TESTER (OPERATE C/OPN RELAY) |
Connect the intelligent tester to the DLC3.
Turn the power switch on (IG).
Turn the tester on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check whether the fuel pump operation sound occurs when performing the Active Test on the tester.
|
| ||||
| OK | ||
| ||
| 2.INSPECT INTEGRATION NO.2 RELAY (C/OPN RELAY) |
![]() |
Remove the integration relay from the engine room relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1B-4 - 1B-8 | No battery voltage applied to terminals 1B-6 and 1B-7 | 10 kΩ or higher |
| Battery voltage applied to terminals 1B-6 and 1B-7 | Below 1 Ω |
| *1 | Component without harness connected (Integration Relay) |
Reconnect the integration relay connector.
Reinstall the integration relay.
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (C/OPN RELAY - ECM) |
Disconnect the ECM connector.

Remove the integration relay from the engine room relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1B-7 - A57-8 (FC) | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| 1B-7 or A57-8 (FC) - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector (to ECM) | *2 | Integration Relay |
| *3 | Front view of wire harness connector (to Integration Relay) | - | - |
Reconnect the ECM connector.
Reconnect the integration relay connector.
Reinstall the integration relay.
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (C/OPN RELAY - IG2 RELAY) |
Remove the integration relay from the engine room relay block.

Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1A-4 - 1B-6 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| 1A-4 or 1B-6 - Body ground | Always | 10 kΩ or higher |
| *1 | Integration Relay | *2 | Front view of wire harness connector (to Integration Relay) |
Reconnect the integration relay connector.
Reinstall the integration relay.
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (C/OPN RELAY - FUEL PUMP) |
Disconnect the fuel pump connector.

Remove the integration relay from the engine room relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1B-8 - R11-4 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| 1B-8 or R11-4 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector (to Fuel Pump) | *2 | Integration Relay |
| *3 | Front view of wire harness connector (to Integration Relay) | - | - |
Reconnect the fuel pump connector.
Reconnect the integration relay connector.
Reinstall the integration relay.
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (FUEL PUMP - BODY GROUND) |
![]() |
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| R11-5 - Body ground | Always | Below 1 Ω |
| *1 | Front view of wire harness connector (to Fuel Pump) |
Reconnect the fuel pump connector.
|
| ||||
| OK | |
| 7.INSPECT FUEL PUMP |
Inspect the fuel pump (Click here).
|
| ||||
| OK | |
| 8.CHECK ECM POWER SOURCE CIRCUIT |
Check the ECM power source circuit (Click here).
|
| ||||
| OK | ||
| ||