Home › Engine / Hybrid System › 2ZR-FXE COOLING › FLOW SHUTTING VALVE
RM3210E _51 Engine / Hybrid System _047499 2ZR-FXE COOLING _0233535 FLOW SHUTTING VALVE A

2ZR-FXE COOLING  FLOW SHUTTING VALVE  INSTALLATION  


PROCEDURE

Hide 16671 1.INSTALL FLOW SHUTTING VALVE (WATER VALVE)

a.

Install a new gasket to the flow shutting valve (water valve).


b.

Install the flow shutting valve (water valve) with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Remove the water outlet from the vise.


d.

Install a new water outlet gasket to the cylinder head sub-assembly.


e.

Connect the No. 10 water by-pass hose and slide the clip to secure it.


f.

Install the water outlet with the flow shutting valve (water valve) with the 2 nuts.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)


g.

Connect the No. 9 water by-pass hose and slide the clip to secure it.


h.

Connect the No. 3 radiator hose and slide the clip to secure it.


i.

Engage the clamp to connect the wire harness to the water outlet.


j.

Connect the 3 connectors.


Hide G9200 2.INSTALL INVERTER WITH CONVERTER ASSEMBLY

Hide 4.INSPECT FOR COOLANT LEAK (for Engine)