2005-2008 RAV4 · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Nov 2005 – Dec 2006

Versions by build date: Nov 2005 – Dec 2006 Jan 2007 – Jul 2007 from Aug 2007


1. INSTALL TURBOCHARGER SUB-ASSEMBLY

  1. A123597
    Install a new gasket and the turbocharger with the 3 nuts.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }


2. INSTALL TURBOCHARGER STAY

  1. A116281
    Install the turbocharger stay with the 2 nuts and 2 spacers.

    Torque:
    36 N*m{ 370 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Do not reuse the turbo stay.


3. INSTALL NO. 2 TURBO OIL PIPE

  1. A123596
    Install 2 new gaskets and the turbo oil pipe with the 2 bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }


4. INSTALL EGR COOLER ASSEMBLY
  1. Install 2 new gaskets and a new O-ring to the EGR cooler.

  1. A124936
    Temporarily install the EGR cooler with the 2 bolts and 2 nuts.

  1. Temporarily install the 4 bolts.

  1. A114898
    Tighten the 2 bolts and 2 nuts holding the EGR cooler to the cylinder block.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A114900
    Tighten the 2 bolts holding the EGR cooler to the exhaust manifold.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. A124937
    Tighten the 2 bolts holding the EGR cooler to the cylinder head.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }


5. INSTALL TURBO OIL OUTLET PIPE

  1. A123560
    Install 2 new gaskets and the oil pipe with the 4 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }


6. INSTALL NO. 5 WATER BY-PASS PIPE

  1. A123598E01
    Using needle-nose pliers, grip the claws of the clip and slide the clip to install the No. 2 and No. 3 water by-pass hoses.

  1. A123559
    Install the pipe with the 2 bolts.

    Torque:
    28 N*m{ 285 kgf*cm , 21 ft.*lbf }


7. INSTALL NO. 1 TURBO INSULATOR

  1. A123558
    Install the insulator with the 2 bolts.

    Torque:
    20.5 N*m{ 209 kgf*cm , 15 ft.*lbf }


8. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

  1. A110789
    Temporarily install a new gasket and the exhaust manifold converter with the 3 nuts.

  1. A124938
    Temporarily install the No. 2 exhaust manifold stay with the nut and 2 bolts.

  1. A114905
    Temporarily install the No. 2 manifold stay with the 3 bolts.

  1. A110767
    Temporarily install the No. 1 manifold stay with the bolt and nut.

  1. A124939
    Tighten the 2 bolts holding the No. 2 exhaust manifold stay to the cylinder block (upper bolt → lower bolt).

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A110789
    While tightening the manifold converter towards turbocharger, tighten the 3 nuts holding the exhaust manifold converter to the turbocharger.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. A127791
    Tighten the nut holding the No. 2 exhaust manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A114987
    Tighten the bolt holding the No. 2 manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

    HINT:
    Ensure that the stay is pushed flush to the cylinder block and manifold converter while tightening.

  1. A114986
    Tighten the 2 bolts holding the No. 2 manifold stay to the cylinder block.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A114989
    Tighten the bolt holding the No. 1 manifold stay to the cylinder head.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    HINT:
    Ensure that the stay is pushed flush to the cylinder head and manifold converter while tightening.

  1. A114988
    Tighten the nut holding the No. 1 manifold stay to the exhaust manifold converter.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


9. INSTALL NO. 1 MANIFOLD CONVERTER INSULATOR

  1. A110807
    Install the manifold converter insulator with the 4 bolts.

    Torque:
    28.5 N*m{ 291 kgf*cm , 21 ft.*lbf }


10. INSTALL ENGINE ASSEMBLY
  1. Install the engine to the vehicle (Click here).

← INSPECTION (from Nov 2005)INSTALLATION (Jan 2007 – Jul 2007) →