2005-2008 RAV4 · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2007

Versions by build date: Jan 2007 – Jul 2007 from Aug 2007


1. INSTALL NO. 2 TURBO OIL PIPE
  1. Temporarily install 2 new gaskets and the turbo oil pipe with the 2 bolts.


2. INSTALL TURBOCHARGER SUB-ASSEMBLY

  1. A123597
    Install a new gasket and the turbocharger with the 3 nuts.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }


3. INSTALL TURBOCHARGER STAY

  1. A116281
    Install a new turbocharger stay with the 2 nuts and 2 spacers.

    Torque:
    36 N*m{ 370 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Do not reuse the turbo stay.


4. TIGHTEN NO. 2 TURBO OIL PIPE

  1. A113484
    Tighten the turbo oil pipe with the 2 bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. A113485
    Connect the 2 vacuum hoses.


5. INSTALL TURBO OIL OUTLET PIPE

  1. A113483
    Install 2 new gaskets and the oil pipe with the 4 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }


6. INSTALL NO. 5 WATER BY-PASS PIPE

  1. A123598E01
    Using needle-nose pliers, grip the claws of the clip and slide the clip to install the No. 2 and No. 3 water by-pass hoses.

  1. A123559
    Install the pipe with the 2 bolts.

    Torque:
    28 N*m{ 285 kgf*cm , 21 ft.*lbf }


7. INSTALL NO. 1 TURBO INSULATOR

  1. A123558
    Install the insulator with the 2 bolts.

    Torque:
    21 N*m{ 209 kgf*cm , 15 ft.*lbf }


8. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

  1. A110789
    Temporarily install a new turbine outlet elbow gasket and exhaust manifold converter with the 3 nuts.

  1. A110768
    Temporarily install the No. 2 exhaust manifold stay with the 2 bolts and nut.

  1. A110790
    Temporarily install the No. 2 manifold stay with the 3 bolts.

  1. Temporarily install the No. 1 manifold stay with the bolt and nut.

  1. A116310
    Tighten the 2 bolts of the No. 2 exhaust manifold stay to the cylinder block.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

    NOTICE:
    Make sure to tighten the upper bolt first and the lower bolt last.

  1. A110789
    Tighten the 3 nuts of the exhaust manifold converter to the turbocharger sub-assembly (while pushing the manifold converter towards the turbocharger sub-assembly).

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. A116309
    Tighten the nut of the No. 2 exhaust manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A116307
    Tighten the bolt of the No. 2 manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

    HINT:
    Ensure that the stay is pushed flush to the cylinder block and manifold converter while tightening.

  1. A116308
    Tighten the 2 bolts of the No. 2 manifold stay to the cylinder block.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. Tighten the bolt of the No. 1 manifold stay to the cylinder head.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    HINT:
    Ensure that the stay is pushed flush to the cylinder block and manifold converter while tightening.

  1. Tighten the nut of the No. 1 manifold stay to the exhaust manifold converter.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


9. INSTALL NO. 2 MANIFOLD CONVERTER INSULATOR

  1. A114858
    Install the No. 2 manifold converter insulator with the 3 nuts.

    Torque:
    29 N*m{ 291 kgf*cm , 21 ft.*lbf }


10. INSTALL NO. 1 MANIFOLD CONVERTER INSULATOR

  1. A114857
    Install the No. 1 manifold converter insulator with the 5 bolts.

    Torque:
    29 N*m{ 291 kgf*cm , 21 ft.*lbf }


11. INSTALL ENGINE ASSEMBLY
  1. Install the engine to the vehicle (Click here).

← INSTALLATION (Jan 2007 – Jul 2007)COMPONENTS (from Nov 2005) →