Home › ENGINE ยท 2AD-FTV › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A196712
  1. Install the generator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Be careful that the wire harness of the crankshaft position sensor does not get caught between the cylinder block and generator when installing the generator.



    A208275E01
  1. Attach the wire harness clamp and connect the generator wire with the nut and bolt.

    Torque:
    for nut:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
    for bolt:
    7.7 N*m{ 78 kgf*cm , 68 in.*lbf }

  1. Install the terminal cap.

  1. Connect the generator connector.



2. INSTALL WIRE HARNESS CLAMP BRACKET (for DPF)


    A208276
  1. Install the wire harness clamp bracket with the bolt.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }

  1. Attach the wire harness clamp and connect the sensor connector.



3. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH
  1. Install the front drive shaft (Click here ).



4. INSTALL FAN AND GENERATOR V BELT
  1. Install the belt (Click here).



5. INSTALL NO. 1 ENGINE COVER


    A203808
  1. Attach the 4 clips to install the engine cover.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL