11363A
1.INSTALL FLYWHEEL HOUSING SIDE COVER
Install the flywheel housing side cover to the cylinder block.
28100
2.INSTALL STARTER ASSEMBLY
Install the starter assembly with the 2 bolts.
Connect the starter connector.
Connect the starter wire with the nut.
Connect the terminal cap.
33823
3.INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET (for CVT)
33820B
4.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for CVT)
Connect the transmission control cable to the No. 1 transmission control cable bracket with a new clip.
74414B
5.INSTALL BATTERY BRACKET REINFORCEMENT
Install the battery bracket reinforcement with the 2 bolts.
74417
6.INSTALL FRONT BATTERY BRACKET
Install the front battery bracket with the 4 bolts.
Attach the 3 wire harness clamps.
16057
7.CONNECT RADIATOR HOSE SUB-ASSEMBLY
Connect the radiator hose to the front battery bracket with the 2 bolts.
74431
8.INSTALL BATTERY TRAY
28800
9.INSTALL BATTERY
74404A
10.INSTALL BATTERY CLAMP SUB-ASSEMBLY
Attach the hook of the battery clamp to the front battery bracket.
Partially tighten the nut and temporarily install the bolt.
Adjust the battery clamp position.
Tighten the nut and bolt.
17705
11.INSTALL AIR CLEANER CAP SUB-ASSEMBLY
12.CONNECT CABLE TO POSITIVE BATTERY TERMINAL
13.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
11212
14.INSTALL NO. 2 CYLINDER HEAD COVER
51441
15.INSTALL NO. 1 ENGINE UNDER COVER