88515
1.INSTALL COOLER EXPANSION VALVE
Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.
ND-OIL 8 or equivalent
Install the 2 O-rings to the No. 1 cooler evaporator sub-assembly.
Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.
88707
2.CONNECT AIR CONDITIONING TUBE
55789D
3.INSTALL NO. 3 COWL TOP PANEL INSULATOR (for 2WW)
12611
4.INSTALL NO. 1 ENGINE COVER (for 2WW)
5.CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
6.WARM UP ENGINE
7.INSPECT FOR REFRIGERANT LEAK