Always be sure to check the tightening torque.
If the pressure lines are leaking after installation, they must be replaced.
Do not overtighten the pressure lines.
23990
1.INSTALL PRESSURE DISCHARGE VALVE ASSEMBLY
Perform "Fuel PCV Compensation Value Reset" after replacing the pressure discharge valve assembly.
Click hereEngine / Hybrid System>2WW ENGINE CONTROL>ECD SYSTEM>INITIALIZATION
Check the threads and sealing surfaces for damages prior to installing the pressure discharge valve assembly.
Make sure the pressure discharge valve assembly, sealing surfaces and threads are free from dirt and any foreign matter before performing work. Lightly grease the threads on the pressure discharge valve assembly.
Step 1:
Screw in the pressure discharge valve assembly by hand. Then tighten the pressure discharge valve assembly.
Step 2:
Loosen the pressure discharge valve assembly by 90°.
Step 3:
Tighten the pressure discharge valve assembly.
23810A
2.INSTALL COMMON RAIL ASSEMBLY
3.PERFORM INITIALIZATION
Perform "Fuel PCV Compensation Value Reset" after replacing the pressure discharge valve assembly.
Click hereEngine / Hybrid System>2WW ENGINE CONTROL>ECD SYSTEM>INITIALIZATION