1.INSPECT SHIFT SOLENOID VALVE SL1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.
Valve moves and makes operating noise.
If the result is not as specified, replace the solenoid valve.
2.INSPECT SHIFT SOLENOID VALVE S1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body | 20°C (68°F) | 11 to 15 Ω |
Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.
Valve moves and makes operating noise.
If the result is not as specified, replace the solenoid valve.
3.INSPECT SHIFT SOLENOID VALVE S2
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body | 20°C (68°F) | 11 to 15 Ω |
Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.
Valve moves and makes operating noise.
If the result is not as specified, replace the solenoid valve.
4.INSPECT SHIFT SOLENOID VALVE S3
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body | 20°C (68°F) | 11 to 15 Ω |
Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.
5.INSPECT SHIFT SOLENOID VALVE S4
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body | 20°C (68°F) | 11 to 15 Ω |
Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.
6.INSPECT SHIFT SOLENOID VALVE SL2
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.
7.INSPECT SHIFT SOLENOID VALVE SR
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve SR connector terminal - Shift solenoid valve SR body | 20°C (68°F) | 11 to 15 Ω |
Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.
8.INSPECT SHIFT SOLENOID VALVE SLT
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.
9.INSPECT SHIFT SOLENOID VALVE SLU
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.
Valve moves and makes an operating noise.
If the result is not as specified, replace the solenoid valve.