1.INSPECT VANE PUMP SHAFT AND BUSH IN VANE PUMP FRONT HOUSING
Using a micrometer, measure the outer diameter [a] of the vane pump shaft.
Using a vernier caliper, measure the inner diameter [b] of the vane pump front housing bush.
Calculate the oil clearance.
Oil clearance = Inner diameter of the bush [b] - Outer diameter of the shaft [a]
0.07 mm (0.00276 in.)
If the oil clearance is more than the maximum, replace the vane pump assembly.
2.INSPECT VANE PUMP ROTOR AND VANE PUMP PLATE
Using a micrometer, measure the thickness of the vane pump plates.
1.405 to 1.411 mm (0.0553 to 0.0556 in.)
If the thickness is not as specified, replace the vane pump assembly.
Using a feeler gauge, measure the clearance between the side face of the vane pump rotor groove and the vane pump plate.
0.03 mm (0.00118 in.)
If the clearance is more than the maximum, replace the vane pump assembly.
3.INSPECT PRESSURE PORT UNION
Visually check the pressure port union for fluid leaks. If there is a leak, replace the vane pump assembly.
4.INSPECT TOTAL PRELOAD
Check that the pump rotates smoothly without abnormal noise.
Temporarily install the service bolt.
10 mm (0.394 in.)
1.25 mm (0.0492 in.)
50 mm (1.97 in.)
Using a torque wrench, measure the pumps rotating torque.
0.3 N*m (3 kgf*cm, 2 in.*lbf) or less
If the rotating torque is not as specified, check the vane pump housing oil seal.