OIL PUMP (for 4WD and Pre-Runner) > INSTALLATION |
| 1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL |
![]() |
Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.
Apply MP grease to the oil seal lip.
| 2. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.
![]() |
Install a new O-ring onto the LH cylinder head as shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the 4 locations shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the timing chain cover as shown in the illustration.
![]() |
Align the key way of the oil pump drive rotor with the rectangular portion of the crankshaft timing gear, and slide the timing chain cover into place.
![]() |
Install the timing chain cover with the 24 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 55 mm (2.17 in.) |
| 3. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY |
Install a new gasket and oil filter bracket with the 3 bolts and 2 nuts.
| 4. INSTALL VVT SENSOR |
LH bank side VVT sensor:
Apply a light coat of engine oil to the O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
Connect the water by-pass hoses No. 4 and No. 5.
RH bank side VVT sensor:
Apply a light coat of engine oil to the O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
| 5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
Install the 2 camshaft timing oil control valves with the 2 bolts.
Connect the 2 connectors.
| 6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Install the cylinder head cover within 3 minutes of applying seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing mush be removed and reapplied.
Install the seal washers onto the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 60 mm (2.36 in.) |
| 7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.
Install the seal washers onto the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 60 mm (2.36 in.) |
| 8. INSTALL IGNITION COIL ASSEMBLY |
Install the 6 ignition coils with the 6 bolts.
Connect the 6 ignition coil connectors.
| 9. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket and the intake air surge tank with the 2 nuts.
Using an 8 mm socket hexagon wrench, install the 4 bolts.
Install the 3 upper bolts which are used to secure the 2 surge tank stays and throttle body bracket.
Install the 3 wire harness clamps and hose clamp.
Connect the throttle motor connector.
Connect the 2 VSV connectors.
Connect the ventilation hose.
Connect the fuel vapor feed hose.
Connect the water by-pass hose No. 4.
Connect the water by-pass hose No. 5.
| 10. INSTALL OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder block, rear oil seal retainer and oil pan.
![]() |
Install a new O-ring onto the oil pump.
![]() |
Apply a continuous bead of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the oil pan as shown in the illustration.
![]() |
Install the oil pan with the 17 bolts and 2 nuts, and tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 45 mm (1.77 in.) |
| C | 14 mm (0.55 in.) |
![]() |
Install the 4 housing bolts.
Install the flywheel housing under cover.
| 11. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil strainer with the 2 nuts.
| 12. INSTALL NO.2 OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the oil pan and oil pan No. 2.
![]() |
Apply a continuous bead of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) as shown in the illustration.
![]() |
Install the oil pan No. 2 with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 13. INSTALL CRANKSHAFT PULLEY |
![]() |
Using SST, install the pulley set bolt.
| 14. INSTALL NO.1 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the idler pulley with the bolt.
| 15. INSTALL NO.2 IDLER PULLEY DUB-ASSEMBLY |
![]() |
Install the 2 idler pulleys with the 2 bolts.
| 16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
| Position | Length |
| A | 70 mm (2.76 in.) |
| B, C, D and E | 33 mm (1.30 in.) |
Use a new bolt in position A.
Finger-tighten the bolts in positions A and E and install the bracket.
Tighten the bolts in positions A and E.
Tighten the bolts in positions B, C and D.
| 17. INSTALL COOLER COMPRESSOR ASSEMBLY |
Install the cooler compressor assembly with the 4 bolts.
Connect the cooler compressor assembly connector.
Install the suction hose sub-assembly with the bolt.
| 18. INSTALL GENERATOR ASSEMBLY |
Install the generator assembly with the 2 bolts.
Install the wire harness clamp bracket with the 2 bolts.
Connect the wire harness.
Connect the wire harness to terminal B and install the nut.
Connect the connector to the generator assembly.
Install the wire harness stay with the bolt.
| 19. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install the vane pump with the 2 bolts.
Connect the power steering pressure switch connector.
Connect the power steering pressure switch connector.
| 20. INSTALL WATER INLET |
Install a new gasket onto the water inlet with thermostat.
Install the water inlet with thermostat with the 3 nuts.
| 21. INSTALL OIL LEVEL GAUGE GUIDE |
| 22. INSTALL AIR CLEANER ASSEMBLY |
Install the air cleaner with the 2 bolts.
Connect the ventilation hose No. 2.
| 23. INSTALL FAN SHROUD |
![]() |
Provisionally install the fan shroud together with the fan pulley.
Install the fan and generator V belt .
Install the fan pulley with the 4 nuts.
Install the fan shroud with the 2 bolts.
Install the 2 cooler hoses into the clamp (with automatic transmission).
Connect the hose to the radiator reserve tank.
| 24. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH |
| 25. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY |
| 26. INSTALL POWER STEERING LINK ASSEMBLY |
| 27. INSTALL BATTERY |
| 28. ADD ENGINE OIL |
Fill with fresh engine oil.
| Drain and refill with oil filter change | 4.5 liters (4.8 US qts, 4.0 lmp. qts) |
| Drain and refill without oil filter change | 4.2 liters (4.4 US qts, 3.7 lmp. qts) |
| Dry fill | 5.6 liters (5.9 US qts, 4.9 lmp. qts) |
| Drain and refill with oil filter change | 5.2 liters (5.5 US qts, 4.6 lmp. qts) |
| Drain and refill without oil filter change | 4.9 liters (5.2 US qts, 4.3 lmp. qts) |
| Dry fill | 6.0 liters (6.3 US qts, 5.3 lmp. qts) |
Reinstall the oil filler cap.
| 29. ADD ENGINE COOLANT |
Pour coolant into the radiator until it overflows.
| Transmission | Capacity |
| Manual Transmission | 9.7 liters (10.3 Us qts, 8.5 Imp. qts) |
| Automatic Transmission | 9.8 liters (10.4 Us qts, 8.6 Imp. qts) |
Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.
Install the radiator cap securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Warm up the engine until the cooling fan operates.
Set the air conditioning as follows while warming up the engine.
| Item | Condition |
| Fan Speed | Any setting except OFF |
| Temperature | Toward WARM |
| Air Conditioning Switch | OFF |
Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.
Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, perform the steps from (a) through (h) and repeat the operation until the coolant level remains at the full level.
Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.
| 30. ADD DIFFERENTIAL OIL (for 4WD) |
| 31. INSPECT DIFFERENTIAL OIL (for 4WD) |
![]() |
Stop the vehicle on a level place.
Remove the differential filler plug and gasket.
Check that the oil level is within 5mm (0 to 0.20 in.) of the bottom of the filler plug opening.
Check for oil leakage if the oil level is low.
Install the differential filler plug and a new gasket.
| 32. ADD POWER STEERING FLUID |
![]() |
Keep the vehicle level.
With the engine stopped, check the fluid level in the oil reservoir.
If necessary, add fluid.
Start the engine and let it idle.
Turn the steering wheel from lock to lock several times to raise fluid temperature.
![]() |
Check for foaming or emulsification.
If any foaming or emulsification is identified, bleed the power steering system.
![]() |
With the engine idling, measure the fluid level in the oil reservoir.
Stop the engine.
Wait a few minutes and measure the fluid level in the oil reservoir again.
Check the fluid level.
| 33. BLEED POWER STEERING FLUID |
Check the fluid level.
Jack up the front of the vehicle and support it with stands.
Turn the steering wheel.
With the engine stopped, turn the wheel slowly from lock to lock several times.
Lower the vehicle.
Start the engine.
Run the engine at idle for a few minutes.
Turn the steering wheel.
With the engine idling, turn the wheel to the left or right full lock position and keep it there for 2 to 3 seconds. Then turn the wheel to the opposite full lock position and keep it there for 2 to 3 seconds (step A).
Repeat step A several times.
Stop the engine.
![]() |
Check for foaming or emulsification.
Especially, if the system has to be bled twice because of foaming or emulsification, check for fluid leakage in the system.
Check the fluid level.
| 34. CHECK FOR ENGINE OIL LEAKAGE |
| 35. CHECK FOR ENGINE COOLANT LEAKAGE |
Fill the radiator with coolant and attach a radiator cap tester.
Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.
| 36. CHECK FOR FUEL LEAKAGE |
| 37. CHECK FOR EXHAUST GAS LEAKAGE |
| 38. CHECK POWER STEERING FLUID LEAKAGE |
| 39. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT |
| 40. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.
| 41. INSPECT IGNITION TIMING |
Warm up the engine.
![]() |
When using the intelligent tester.
Connect the intelligent tester to the DLC3.
Select the following menu items: DIAGNOSIS / ENHANCED OBD ll / DATA LIST / IGN ADVANCE.
Inspect the ignition timing during idling.
Check that the ignition timing advances immediately when the engine speed is increased.
![]() |
When not using intelligent tester.
Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.
Remove the air cleaner.
![]() |
Pull out the wire harness as shown in the illustration.
Connect the tester probe of a timing light to the wire of the ignition coil connector for No. 1 cylinder.
![]() |
Inspect the ignition timing during idling.
Remove the SST from the DLC3.
Inspect the ignition timing during idling.
Install the air cleaner.
| 42. INSPECT ENGINE IDLING SPEED |
Warm up the engine.
![]() |
When using the intelligent tester:
Connect the intelligent tester to the DLC3.
Select the following menu items: DIAGNOSIS / ENHANCED OBD ll / DATA LIST / ENGINE SPD.
Inspect the engine idling speed.
![]() |
When not using the intelligent tester:
Using SST, connect the terminal 8 (TAC) of the DLC3.
Race the engine speed at 2,500 rpm for approximately 90 seconds.
Inspect the engine idling speed.
| 43. INSPECT COMPRESSION |
Warm up and stop the engine.
Remove the circuit opening relay.
Remove the V-bank cover.
Remove the air cleaner assembly.
Remove the ignition coils.
Remove the spark plugs.
![]() |
Inspect the cylinder compression pressure.
Insert a compression gage into the spark plug hole.
Fully open the throttle.
While cranking the engine, measure the compression pressure.
If the cylinder compression is low, pour a small amount of engine oil into the cylinder through the spark plug hole and repeat steps (1) through (3) for cylinders with low compression.
| 44. INSPECT CO/HC |
Start the engine.
Run the engine at 2,500 rpm for approximately 180 seconds.
Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe during idling.
Immediately check the CO/HC concentration during idling and/or at 2,500 rpm.
If the CO/HC concentration does not comply with regulations, troubleshoot in the order given below.
Check the heated oxygen sensor operation.
| CO | HC | Problems | Causes |
| Normal | High | Rough idling |
|
| Low | High | Rough idling (Fluctuating HC reading) |
|
| High | High | Rough idling (Black smoke from exhaust) |
|