Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › AIR PUMP (for Bank 1)

AIR PUMP (for Bank 1) > INSTALLATION

for Preparation Click here



1. INSTALL AIR PUMP ASSEMBLY


    A158347E01
  1. Install the air pump with the 2 bolts and 2 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Connect the air pump connector.



2. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE
  1. Install the No. 4 air injection system hose as shown in the illustration.



3. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Install a new O-ring to the water by-pass pipe.

  1. Apply soapy water to the O-ring.



    A162643
  1. Push in the water by-pass pipe.

  1. Connect the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector clamp.



4. INSTALL INTAKE MANIFOLD SUB-ASSEMBLY
  1. Install the intake manifold (Click here).



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).