Home › ENGINE ยท 2UZ-FE › ENGINE CONTROL SYSTEM › KNOCK SENSOR

KNOCK SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL KNOCK SENSOR


    A160203E01
  1. Install the 2 sensors with the 2 nuts as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 sensor connectors.



2. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE


3. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Install a new O-ring to the water by-pass pipe.

  1. Apply soapy water to the O-ring.



    A162643
  1. Push in the water by-pass pipe.

  1. Connect the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector clamp.



4. INSTALL INTAKE MANIFOLD ASSEMBLY
  1. Install the intake manifold (Click here).



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).