Home › ENGINE · 1GR-FE › ENGINE CONTROL SYSTEM › SFI SYSTEM

SFI SYSTEM > ECM Power Source Circuit

for Preparation Click here


DESCRIPTION

When the ignition switch is turned to ON, the battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil, closing the contacts of the No. 1 integration relay (EFI relay) and supplying power to either terminal +B or +B2 of the ECM.

WIRING DIAGRAM


A160619E04


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

1.CHECK HARNESS AND CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY)
A201293E03
  1. Remove the No. 1 integration relay from the engine room junction block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1C-1 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.INSPECT NO. 1 INTEGRATION RELAY (EFI)
  1. Inspect the No. 1 integration relay (EFI) .



NG
REPLACE NO. 1 INTEGRATION RELAY
OK


3.CHECK HARNESS AND CONNECTOR (+B, +B2 AND MREL CIRCUIT)
  1. Check the harness and connectors between the No. 1 integration relay and ECM.

    1. Remove the No. 1 integration relay from the engine room junction block.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:

      Tester Connection
      Condition
      Specified Condition
      A24-34 (MREL) - 1B-2
      Always
      Below 1 Ω
      A24-3 (+B) - 1B-4
      Always
      Below 1 Ω
      A24-2 (+B2) - 1B-4
      Always
      Below 1 Ω
      A24-34 (MREL) or 1B-2 - Body ground
      Always
      10 kΩ or higher
      A24-3 (+B) or 1B-4 - Body ground
      Always
      10 kΩ or higher
      A24-2 (+B2) or 1B-4 - Body ground
      Always
      10 kΩ or higher

  1. Check the harness and connectors between the No. 1 integration relay and body ground.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:

      Tester Connection
      Condition
      Specified Condition
      1B-3 - Body ground
      Always
      Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    D74-81 (E1) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.INSPECT ECM (IGSW VOLTAGE)
A248362E02
  1. Disconnect the ECM connectors.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    A24-28 (IGSW) - D74-81 (E1)
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to ECM)



NG
Go to step 6
OK

REPLACE ECM (Click here)  

6.INSPECT NO. 1 INTEGRATION RELAY (IG2)
  1. Inspect the No. 1 integration relay (IG2) .



NG
REPLACE NO. 1 INTEGRATION RELAY
OK


7.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM, NO. 1 INTEGRATION RELAY - BODY GROUND)
  1. Remove the No. 1 integration relay from the engine room junction block.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1B-8 - A24-28 (IGSW)
    Always
    Below 1 Ω
    1B-8 or A24-28 (IGSW) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


8.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - IGNITION SWITCH ASSEMBLY)
  1. Check the harness and connectors between the No. 1 integration relay and ignition switch assembly.

    1. Remove the No. 1 integration relay from the engine room junction block.

    2. Disconnect the ignition switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:

      Tester Connection
      Condition
      Specified Condition
      1B-6 - J9-6 (IG2)
      Always
      Below 1 Ω
      1B-6 or J9-6 (IG2) - Body ground
      Always
      10 kΩ or higher

  1. Check the harness and connectors between the No. 1 integration relay and body ground.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:

      Tester Connection
      Condition
      Specified Condition
      1B-7 - Body ground
      Always
      Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


9.INSPECT IGNITION SWITCH ASSEMBLY
  1. Inspect the ignition switch assembly (Click here).



NG
REPLACE IGNITION SWITCH ASSEMBLY (Click here)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH ASSEMBLY - BATTERY)