INTAKE MANIFOLD > INSTALLATION |
| 1. INSTALL INTAKE MANIFOLD |
![]() |
Set a new gasket on each cylinder head.
Set the intake manifold on the cylinder heads.
![]() |
Install and uniformly tighten the 6 bolts and 4 nuts in several passes.
| *1 | Nut |
| 2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
Temporarily install the 4 bolts, which are used to hold the fuel delivery pipe in place, to the intake manifold.
![]() |
Check that the fuel injectors rotate smoothly.
![]() | Turn |
Position the fuel injectors with the connectors facing outward.
Tighten the 4 bolts.
Connect the 6 fuel injector connectors.
| 3. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket to the intake air surge tank.
![]() |
Install the intake air surge tank with the 4 bolts and 2 nuts in the order shown in the illustration.
| *1 | Nut |
Install the throttle body bracket with the 2 bolts.
Install the No. 1 surge tank stay with the 2 bolts.
Attach the wire harness clamp.
Install the No. 2 surge tank stay with the 2 bolts.
![]() |
Connect the No. 1 ventilation hose.
Connect the vacuum hose.
Connect the No. 1 fuel feed hose.
| *a | Front |
| *b | Matchmark |
| *c | Top |
![]() |
Connect the throttle body connector.
Connect the No. 4 water by-pass hose.
Connect the No. 5 water by-pass hose.
Connect the 2 heater hose clamps.
| *a | Front |
| *b | Matchmark |
| *c | RH |
| 4. INSTALL AIR TUBE ASSEMBLY |
![]() |
for Bank 1 Side:
Align the paint mark with the projection and connect the air tube assembly to the emission control valve set.
| *1 | Projection |
| *2 | Paint Mark |
| *a | Upper |
| *b | RH Side |
![]() |
for Bank 2 Side:
Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.
| *1 | Paint Mark |
| *2 | Projection |
| *a | Upper |
| *b | LH Side |
Install the 3 bolts.
Install the wire harness clamp bracket with the bolt.
Attach the 3 wire harness clamps to the intake air surge tank and bracket.
Connect the purge VSV connector.
![]() |
Connect the air injection system hose to the air tube assembly shown in the illustration.
| *1 | Paint Mark |
| *2 | Projection |
| *a | Upper |
| *b | LH Side |
| 5. INSTALL AIR CLEANER HOSE ASSEMBLY |
![]() |
Install the air cleaner hose with the 2 clamps.
| *1 | Paint Mark |
| *a | Protrusion |
| *b | Groove |
| *c | Top |
| *d | RH |
| *e | Front |
Connect the vacuum hose and ventilation hose.
Attach the wire harness clamp.
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 7. ADD ENGINE COOLANT |
Add engine coolant.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Install the reservoir cap.
Install the radiator cap.*1
Start the engine and stop it immediately.*2
Allow approximately 10 seconds to pass. Then remove the radiator cap and check the coolant level. If the coolant level has decreased, add coolant.*3
Repeat steps *1, *2 and *3 until the coolant level does not decrease.
Install the radiator cap.*4
Set the air conditioning as follows.*5
| Item | Condition |
| Fan speed | Any setting except off |
| Temperature | Toward WARM |
| Air conditioning switch | Off |
Start the engine, warm it up until the thermostat opens, and then continue to run the engine for several minutes to circulate the coolant.*6
Stop the engine, wait until the engine coolant cools down to ambient temperature. Then remove the radiator cap and check the coolant level.*7
If the coolant level has decreased, add coolant and warm up the engine until the thermostat opens.*8
If the coolant level has not decreased, check that the coolant level in the radiator reservoir is at the FULL line.
If the coolant level is below the FULL line, repeat steps *4 through *8.
If the coolant level is above the FULL line, drain coolant until the coolant level reaches the FULL line.
| 8. INSPECT FOR COOLANT LEAK |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 9. INSPECT FOR FUEL LEAK |
Make sure that there are no fuel leaks after performing maintenance on the fuel system.
Connect the Techstream to the DLC3.
Turn the ignition switch to ON and turn the Techstream on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check that there are no leaks from the fuel system.
If there are fuel leaks, repair or replace parts as necessary.
Turn the ignition switch off.
Disconnect the Techstream from the DLC3.
| 10. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
![]() |
Hook the engine under cover to the vehicle body as shown in the illustration.
Install the 3 screws and 5 bolts.
| 11. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY |
Install the front cowl top outer panel with the 7 bolts.
Connect the washer hose.
| 12. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY |