Home › Engine / Hybrid System › 3UR-FBE ENGINE CONTROL › THROTTLE BODY
RM27M0U _51 Engine / Hybrid System _049095 3UR-FBE ENGINE CONTROL _0233929 THROTTLE BODY A

3UR-FBE ENGINE CONTROL  THROTTLE BODY  REMOVAL  


PROCEDURE

Hide 11209 2.REMOVE V-BANK COVER SUB-ASSEMBLY

Hide 17880 3.REMOVE AIR CLEANER HOSE ASSEMBLY

Hide 22210 4.REMOVE THROTTLE BODY ASSEMBLY

a.
A271499

Slide the clamp and disconnect the No. 4 water by-pass hose from the No. 3 water by-pass pipe.


b.

Slide the clamp and disconnect the No. 5 water by-pass hose from the water inlet housing.


c.

Disconnect the throttle position sensor and control motor connector.


d.
A158613

Remove the 4 bolts, throttle with motor body assembly and gasket.


e.

Slide the clamp and remove the No. 4 water by-pass hose from the throttle with motor body assembly.


f.

Slide the clamp and remove the No. 5 water by-pass hose from the throttle with motor body assembly.