25710
1.INSTALL AIR SWITCHING VALVE ASSEMBLY
Install a new gasket and the air switching valve assembly with the 3 bolts.
| *1 | Air Switching Valve Assembly |
| *2 | No. 3 Air Tube |
| *a | Claw |
Make sure the gasket's claws are not caught between the air switching valve assembly and No. 3 air tube.
Install the 2 bolts.
Attach the wire harness clamp to the air switching valve assembly and connect the air switching valve assembly connector.
17341F
2.CONNECT NO. 1 AIR HOSE
Align the paint mark with the projection and connect the No. 1 air hose, and slide the clamp to secure the hose.
| *a | Paint Mark |
| *b | Projection |
Make sure the direction of the hose clamp is as shown in the illustration.
12263
3.CONNECT NO. 3 VENTILATION HOSE
Connect the No. 3 ventilation hose, and slide the clamp to secure the hose.
| *a | Front |
| *b | Rear |
| *c | Paint Mark |
The direction of the hose clamp is indicated in the illustration.
17880
4.INSTALL AIR CLEANER HOSE ASSEMBLY
11209
5.INSTALL V-BANK COVER SUB-ASSEMBLY