11209
1.REMOVE V-BANK COVER SUB-ASSEMBLY
17880
2.REMOVE AIR CLEANER HOSE ASSEMBLY
12263
3.DISCONNECT NO. 3 VENTILATION HOSE
Slide the clamp and disconnect the No. 3 ventilation hose.
17341F
4.DISCONNECT NO. 1 AIR HOSE
Slide the clamp and disconnect the No. 1 air hose.
25710
5.REMOVE AIR SWITCHING VALVE ASSEMBLY
Detach the wire harness clamp and disconnect the air switching valve assembly connector from the air switching valve assembly.
Remove the 2 bolts.
Remove the 3 bolts, air switching valve assembly and gasket.
Be careful not to damage the installation surface of the gaskets.