SFI SYSTEM (for Sedan) > Fuel Injector Circuit |

| 1.INSPECT FUEL INJECTOR ASSEMBLY (POWER SOURCE) |
![]() |
Disconnect the fuel injector assembly connectors.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connections | Specified Conditions |
| C4-1 - Body ground | 11 to 14 V |
| C5-1 - Body ground | 11 to 14 V |
| C6-1 - Body ground | 11 to 14 V |
| C7-1 - Body ground | 11 to 14 V |
Reconnect the fuel injector assembly connectors.
|
| ||||
| OK | |
| 2.INSPECT FUEL INJECTOR ASSEMBLY (INJECTOR RESISTANCE) |
![]() |
Disconnect the fuel injector assembly connectors.
Measure the resistance according to the value(s) in the table below.
| Tester Connections | Specified Conditions |
| 1 - 2 | 11.6 to 12.4 Ω at 20°C (68°F) |
Reconnect the fuel injector assembly connectors.
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM) |
![]() |
Disconnect the C20 ECM connector.
Disconnect the fuel injector assembly connectors.
Measure the resistance according to the value(s) in the table below.
| Tester Connections | Specified Conditions |
| C4-2 - C20-108 (#10) | Below 1 Ω |
| C5-2 - C20-107 (#20) | Below 1 Ω |
| C6-2 - C20-106 (#30) | Below 1 Ω |
| C7-2 - C20-105 (#40) | Below 1 Ω |
| Tester Connections | Specified Conditions |
| C4-2 or C20-108 (#10) - Body ground | 10 kΩ or higher |
| C5-2 or C20-107 (#20) - Body ground | 10 kΩ or higher |
| C6-2 or C20-106 (#30) - Body ground | 10 kΩ or higher |
| C7-2 or C20-105 (#40) - Body ground | 10 kΩ or higher |
Reconnect the fuel injector assembly connectors.
Reconnect the ECM connector.
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
![]() |
Disconnect the C20 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connections | Specified Conditions |
| C20-45 (E01) - Body ground | Below 1 Ω |
| C20-44 (E02) - Body ground | Below 1 Ω |
Reconnect the ECM connector.
|
| ||||
| OK | |
| 5.INSPECT FUEL INJECTOR ASSEMBLY (INJECTION AND VOLUME) |
Check the fuel injector injection and volume (Click here).
|
| ||||
| OK | ||
| ||
| 6.CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - INTEGRATION RELAY) |
![]() |
Disconnect the fuel injector assembly connectors.
Remove the integration relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connections | Specified Conditions |
| C4-1 - 1B-4 (Integration relay) | Below 1 Ω |
| C5-1 - 1B-4 (Integration relay) | Below 1 Ω |
| C6-1 - 1B-4 (Integration relay) | Below 1 Ω |
| C7-1 - 1B-4 (Integration relay) | Below 1 Ω |
| Tester Connections | Specified Conditions |
| C4-1 or 1B-4 (Integration relay) - Body ground | 10 kΩ or higher |
| C5-1 or 1B-4 (Integration relay) - Body ground | 10 kΩ or higher |
| C6-1 or 1B-4 (Integration relay) - Body ground | 10 kΩ or higher |
| C7-1 or 1B-4 (Integration relay) - Body ground | 10 kΩ or higher |
Reconnect the fuel injector assembly connectors.
Reinstall the integration relay.
|
| ||||
| OK | ||
| ||