Home › Engine / Hybrid System › 2NZ-FE ENGINE MECHANICAL › ENGINE UNIT › 2013.08–2016.10
RM30M0E _51 Engine / Hybrid System _017074 2NZ-FE ENGINE MECHANICAL _0091019 ENGINE UNIT A

2NZ-FE ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


PROCEDURE

Hide 1.INSTALL WIRE HARNESS CLAMP BRACKET

a.

Install the 2 wire harness clamp brackets to the cylinder head sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 44763 2.INSTALL BOOSTER VACUUM TUBE

a.

Install the booster vacuum tube to the cylinder head sub-assembly with the 2 bolts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


Hide 89422 3.INSTALL ENGINE COOLANT TEMPERATURE SENSOR

Hide 83530 4.INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY

Hide 16268 5.INSTALL NO. 1 WATER BY-PASS PIPE

a.

Install a new water by-pass pipe gasket to the cylinder block sub-assembly.


b.

Install the No. 1 water by-pass pipe to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts and 2 nuts.

Torque:
Nut : 9.0 N*m (92 kgf*cm, 80 in.*lbf)
Bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 27060 7.INSTALL GENERATOR WITH REGULATOR ASSEMBLY

Hide 16381 8.INSTALL FAN BELT ADJUSTING BAR