Home › Vehicle Interior › METER / GAUGE / DISPLAY › HEADUP DISPLAY › 2020.03–2020.07
RM36W0E _58 Vehicle Interior _087985 METER / GAUGE / DISPLAY _0420199 HEADUP DISPLAY A

METER / GAUGE / DISPLAY  HEADUP DISPLAY  INSTALLATION  


PROCEDURE

Hide 83108 1.INSTALL METER MIRROR SUB-ASSEMBLY

a.
E438480E01
3.125,0.927 3.281,1.125 0.156,0.198 10 true 1 0.198,1.656 0.354,1.854 0.156,0.198 10 true 3 1.844,1.854 2,2.052 0.156,0.198 10 true 2

Engage the guide.


b.

Temporarily install the meter mirror sub-assembly with the 2 nuts and bolt.


c.

Tighten the 2 nuts and bolt in the order shown in the illustration.


d.

Connect the connector.


e.

Engage the clamp.


Hide 55084E 2.INSTALL NO. 1 HEATER TO REGISTER DUCT SUB-ASSEMBLY

Hide 55302C 3.INSTALL INSTRUMENT PANEL SUB-ASSEMBLY