Cranking Holding Function Circuit
Circuit diagnosis · Vehicles built from Aug 2005
DESCRIPTION
The cranking holding control system provides a current to the starter when the ECM detects the ignition switch's start signal (STSW). When the ECM judges that the engine has started, the system cuts the current to the starter. When the ECM receives the STSW signal, it turns on the ACC (Accessory) relay, which prevents flickering of the combination meter, clock and audio system. Also, the ECM sends a signal to the ECM's STAR terminal. Then the STAR output signal travels through the Park/Neutral Position (PNP) switch to the ST relay, causing the starter to activate. When the engine is cranking, the starter operation signal is sent to the ECM's STA terminal.

WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL) |
Connect an intelligent tester to the DLC3.
Turn the ignition switch on (IG) and turn the tester on.
Select the following menu items: Powertrain / Engine and ECT / Data List / Starter Signal.
Check the result when the ignition switch is turned on (IG) and the engine starts.
- OK:
Conditions
Starter Signal
Ignition switch on (IG)
OFF
Engine start
ON
|
|
||||
| NG | |
| 2. INSPECT ECM (STSW VOLTAGE) |
![]() ![]() |
Disconnect the A21 ECM connector.
Measure the voltage between the terminals of the ECM connector and the body ground while cranking the engine.
- Standard voltage:
Tester Connections
Specified Conditions
STSW (A21-14) - Body ground
9 to 14 V
- Result:
Result
Proceed To
Within standard range (A/T)
A
Within standard range (M/T)
B
Outside standard range
C
Reconnect the ECM connector.
|
|
||||
|
|
||||
| A | |
| 3. INSPECT ECM (STAR VOLTAGE) |
![]() ![]() |
Disconnect the C27 Park/Neutral Position (PNP) switch connector.
Measure the voltage between the terminals of the PNP switch connector and the body ground while cranking the engine.
- Standard voltage:
Tester Connections
Specified Conditions
B (C27-4) - Body ground
9 to 14 V
Reconnect the PNP switch connector.
|
|
||||
| OK | |
| 4. INSPECT PARK / NEUTRAL POSITION SWITCH ASSEMBLY |
![]() ![]() |
Disconnect the C27 PNP switch connector.
Check the resistance between each terminal shown below when the shift lever is moved to each range.
- Standard resistance:
Shift Position
Tester Connections
Specified Conditions
P
PL (6) - RB (2)
Below 1 Ω
L (5) - B (4)
R
RL (1) - RB (2)
N
NL (9) - RB (2)
L (5) - B (4)
D
DL (7) - RB (2)
2
2L (3) - RB (2)
L
LL (8) - RB (2)
Reconnect the PNP switch connector.
|
|
||||
| OK | |
| 5. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM) |
![]() ![]() |
Disconnect the C27 PNP switch connector.
Disconnect the A21 ECM connector.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
L (C27-5) - STA (A21-48)
Below 1 Ω
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
L (C27-5) or STA (A21-48) - Body ground
10 kΩ or higher
Reconnect the PNP switch connector.
Reconnect the ECM connector.
|
|
||||
| OK | ||
| ||
| 6. INSPECT ECM (STAR VOLTAGE) |
![]() ![]() |
Disconnect the A16 clutch start switch connector.
Measure the voltage between the terminals of the clutch start switch connector and the body ground while cranking the engine.
- Standard voltage:
Tester Connections
Specified Conditions
B (A16-2) - Body ground
9 to 14 V
Reconnect the clutch start switch connector.
|
|
||||
| OK | |
| 7. INSPECT CLUTCH START SWITCH |
![]() ![]() |
Disconnect the A16 clutch start switch connector.
Check the resistance between the terminals of the clutch start switch.
- Standard resistance:
Switch Positions
Specified Conditions
Pushed in
Below 1 Ω
Released
10 kΩ or higher
Reconnect the clutch start switch connector.
|
|
||||
| OK | |
| 8. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH - ECM) |
![]() ![]() |
Disconnect the A16 clutch start switch connector.
Disconnect the A21 ECM connector.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
L (A16-1) - STA (A21-48)
Below 1 Ω
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
L (A16-1) or STA (A21-48) - Body ground
10 kΩ or higher
Reconnect the clutch start switch connector.
Reconnect the ECM connector.
|
|
||||
| OK | ||
| ||
| 9. INSPECT IGNITION SWITCH |
![]() ![]() |
Disconnect the D8 ignition switch connector.
Check the resistance between the terminals shown below.
- Standard resistance:
Key Positions
Tester Connections
Specified Conditions
LOCK
-
10 kΩ or higher
ACC
2 - 4
Below 1 Ω
ON
1 - 2 - 4
5 - 6
START
1 - 3 - 4
5 - 6 - 7
Reconnect the ignition switch connector.
|
|
||||
| OK | ||
| ||
| 10. CHECK HARNESS AND CONNECTOR (IGNITION SWITCH - PARK/NEUTRAL POSITION SWITCH - ECM) |
![]() ![]() |
Disconnect the D8 ignition switch connector.
Disconnect the C27 PNP switch connector.
Disconnect the C20 ECM connector.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
ST2 (D8-7) - B (C27-4)
Below 1 Ω
STAR (C20-52) - B (C27-4)
STAR (C20-52) - L (C27-5)
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
ST2 (D8-7) or B (C27-4) - Body ground
10 kΩ or higher
STAR (C20-52) or B (C27-4) - Body ground
STAR (C20-52) or L (C27-5) - Body ground
Reconnect the ignition switch connector.
Reconnect the PNP switch connector.
Reconnect the ECM connector.
|
|
||||
| OK | ||
| ||
| 11. CHECK HARNESS AND CONNECTOR (IGNITION SWITCH - CLUTCH START SWITCH - ECM) |
![]() ![]() |
Disconnect the D8 ignition switch connector.
Disconnect the A16 clutch start switch connector.
Disconnect the C20 ECM connector.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
ST2 (D8-7) - B (A16-2)
Below 1 Ω
STAR (C20-52) - B (A16-2)
STAR (C20-52) - L (A16-1)
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
ST2 (D8-7) or B (A16-2) - Body ground
10 kΩ or higher
STAR (C20-52) or B (A16-2) - Body ground
STAR (C20-52) or L (A16-1) - Body ground
Reconnect the ignition switch connector.
Reconnect the clutch start switch connector.
Reconnect the ECM connector.
|
|
||||
| OK | ||
| ||
| 12. INSPECT BATTERY |
Check that the battery is not depleted.
- OK:
- Battery is not depleted.
|
|
||||
| OK | |
| 13. CHECK BATTERY TERMINAL |
Check that the battery terminals are not loose or corroded.
- OK:
- Battery terminals are not loose or corroded.
|
|
||||
| OK | |
| 14. CHECK HARNESS AND CONNECTOR (PNP SWITCH OR CLUTCH START SWITCH - ST RELAY) |
![]() ![]() |
Remove the ST relay from the engine room relay block.
Disconnect the C27 PNP switch connector (A/T).
Disconnect the A16 clutch start switch connector (M/T).
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
L (C27-5) - ST relay (2)
Below 1 Ω
L (A16-1) - ST relay (2)
ST relay (1) - Body ground
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
L (C27-5) or ST relay (2) - Body ground
10 kΩ or higher
L (A16-1) or ST relay (2) - Body ground
Reinstall the ST relay.
Reconnect the PNP switch connector (A/T).
Reconnect the clutch start switch connector (M/T).
|
|
||||
| OK | ||
| ||











